Grid Interactive Rooftop Renewable Energy Generating System Regulation 2019

Sr.No. Title Link
    1 Procedure for Application for connectivity of Renewable Energy Generating System with MSEDCL’s Network  –  Annexure-1
    2 Application Form for installation of Renewable Energy Generating System under Net Metering Arrangement or Net Billing Arrangement  –  Annexure-2
    3 Net Metering Connection Agreement  – Annexure-3
    4 Net Billing Connection Agreement   – Annexure-4
    5 Prior Intimation for Installation of Renewable Energy Generator behind the Consumer’s Meter   – Annexure-5
    6 Commercial Circular 322Connectivity to the Distribution network of MSEDCL for eligible consumers installing Rooftop Renewable Energy Generating Systems in his premises under MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019-Procedure for Application, methodology for Metering & Billing, etc.
    7 Installed Capacity of Rooftop Renewable Energy Generating System on DTC
    8 Commercial Circular No.331
    9 Standard operating Procedure (SoP)

Urja
Empowering the Consumer