Renewable Energy Circulars

Circular
Sr. No.
Name of the Circular Date of the
Circular
10 Installation of Rooftop Solar in the premises of Sugar factories having EPA/PPA with MSEDCL for their Bagasse based Cogeneration plant 18.03.2024
9 Submission of invoices in r/o RE Generation for Interstate through WEB Portal of MSEDCL 28.06.2023
8 Facility for online payment of open access charges in respect of renewable energy generators through NCE portal 23.06.2023
7 मुख्यमंत्री सौर कृषी वाहिनी योजनेंतर्गत कृषी वाहिनीचे सौर ऊर्जीकरण करण्याच्या दृष्टीने लागणाऱ्या जमीनीचा भाडेपट्टा निश्चित करण्याचे सुधारित धोरण व आवश्यक जमीनी सुलभरित्या व शिघ्रगतीने उपलब्ध करण्याबाबत आवश्यक सहाय्य देण्याबाबत. 16.11.2022
6 Guidelines for online application to the consumers opting 100% Renewable Energy for levy of Green Power Tariff- Amendment I 25.08.2022
5 MSEDCL’s Renewable Energy Circular No.05 dated-16.06.2022 regarding Procedure for purchase of 10% banked Wind/Solar energy by MSEDCL 16.06.2022
4. Guidelines for online application to the consumers opting 100% Renewable Energy for levy of Green Power Tariff. 12.04.2022
3. Procedure for levy of Green Power Tariff to the consumers opting for 100% Renewable Energy 23.03.2022
2. Circular for Procedure of Change in Name/Ownership of Renewable Energy Generators,A. Joint Application Form
B. Draft Undertaking
C. Draft PPA for Change in Name
D. Draft PPA for Change in Ownership
09.07.2019
1. Circular for Commissioning Procedure of connectivity/commissioning of solar power projects under MSKVY 04.12.2018

Urja
Empowering the Consumer