1 |
Procedure for Application for connectivity of Renewable Energy Generating System with MSEDCL’s Network – Annexure-1 |
 |
2 |
Application Form for installation of Renewable Energy Generating System under Net Metering Arrangement or Net Billing Arrangement – Annexure-2 |
 |
3 |
Net Metering Connection Agreement – Annexure-3 |
 |
4 |
Net Billing Connection Agreement – Annexure-4 |
 |
5 |
Prior Intimation for Installation of Renewable Energy Generator behind the Consumer’s Meter – Annexure-5 |
 |
6 |
Commercial Circular 322: Connectivity to the Distribution network of MSEDCL for eligible consumers installing Rooftop Renewable Energy Generating Systems in his premises under MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019-Procedure for Application, methodology for Metering & Billing, etc. |
 |
7 |
Installed Capacity of Rooftop Renewable Energy Generating System on DTC |
 |
8 |
Commercial Circular No.331 |
 |
9 |
Standard operating Procedure (SoP) |
 |