91 |
ED(Dist-II)/M-I/NSC-Guidelines/35530 |
14/11/2024 |
Infrastructure development for release of new connections/Enhancement of Load – Guidelines thereof |
|
90 |
CE(Dist)/M-I/PS/Infra Guidelines/023715 |
01/08/2024 |
Infrastructure Development for release of New Connections – Revised Guidelines thereof |
|
89 |
Ref.Director(Op.)/Dist./M-I/NC-Circular/37112 |
20/12/2023 |
Release of New Service Connections (Excluding Ag. Connections)-Guidelines thereof |
|
88 |
CE(Dist)/M-I/NC/NC-Refund/15894 |
02/06/2023 |
Refund of expenditure on Infrastructure Development for release of New Connections under New Consumer/Connection (NC)-Refund Scheme. |
|
87 |
CE(Dist.)/M-III/Schedule of Charges/14106 |
18/05/2023 |
Schedule of Charges (SoC) for various services of MSEDCL (with effect from 1st April- 2023.) |
|
86 |
CE(Dist)/M-I/General/DDF Centages FY 2022-23/3905 |
13/02/2023 |
Loading of centages in estimates for DDF, DPDC, Scheme works FY 2022-23 |
|
85 |
CE(Dist)/ M-I/ NC/ 8353 |
04/04/2022 |
Supplementary Guidelines for Infrastructure Development to release New Connection |
|
84 |
मु.अ.(वितरण)/भांका–१ /जीप्रयो/१२६८७ |
07/06/2021 |
Dr. Babasaheb Ambedkar Jivan Prakash Yojana Circular |
|
83 |
CE(Dist)/ M-I/ Bus Duct/ 6659 |
19/03/2021 |
Guidelines and delegation of power for approv Rising Mains Bus Duct in Multi Storied buildings |
|
82 |
CE(Dist.)/M-I/NSC/ 6660 |
19/03/2021 |
Supplementary guidelines for Infrastructure development to release new connections |
|
81 |
CE(Dist.)/M-III/ Schedule of Charges/ 09078 |
07/04/2020 |
Schedule of Charges (SoC) for various services of MSEDCL (with effect from 1st April- 2020.) |
|
80 |
CE(Dist)/M-1/F-516/NSC-Augmentation/No 30441 |
04/11/2019 |
Guidelines for Infrastructure development to release new connections-requirement of land for establishment of distribution transformer in case of augmentation at same place |
|
79 |
ED (Dist-II)/LT-Conn sanction/26331 |
18/09/2019 |
Revised delegation of powers to Sanction Estimate of new LT Connections. |
|
78 |
CE(Dist)/D-III/FN-506/NSC/27609 |
30/09/2019 |
Guidelines for infrastucture devlopment to release new connections. |
|
77 |
CE(Dist)/RE-I/27494 |
27/09/2019 |
Designation of the officers /offices competent to receive & settle applications for compensation under the SoP & List of Executive Engineer |
|
76 |
CE(Dist)/D-III/FN-506/NSC/27609 |
30/09/2019 |
Guidelines (Additional) for Infrastructure Development to release new connection. |
|
75 |
E.D.(Dist-II ) /Guidelines/NonSoP/25388 |
11/09/2019 |
Guidelines for sanctioning of power supply to Existing / New Consumers demanding power
supply on higher voltage level (Non SoP level) than specified in MERC Standard of
Performance (SoP) Regulations. 2014. |
|
74 |
CE(Dist.)/RE/RE-1/16280 |
13/06/2019 |
MERC Order in case no. 102 of 2019 Dtd. 20.05.2019 (Regarding exempting the timelines for releasing the connections to Agriculture and Residential consumers & determination of compensation thereof) |
|
73 |
CE (Dist)/D-III/R&M/11102 |
07/05/2019 |
Guidelines for execution of R & M works and utilization of funds thereof. |
|
72 |
CE(Dist.)/RE-I/11839 |
07/05/2019 |
Circular about unplanned and frequent power outages in MIDC and other areas |
|
71 |
ED/Dist-II/16213 |
12/06/2019 |
Circular regarding Removal of illegally fixed communication cables on MSEDCL Structures |
|
70 |
CE(Dist_/RE/RE-1/16280 |
13/06/2019 |
Circular regarding MERC order in case no. 102 of 2019 dtd 20.05.2019. |
|
69 |
CE (Dist)/D-III/NSC/14157 |
21/05/2019 |
Clarification guidelines for development of infrastructure by an applicant for NSC and refund of the expenditure on infrastructure. |
|
68 |
CE (Dist)/D-III/Technical/7949 |
19/03/2019 |
Supplementary guidelines for Infrastructure development to release new connections |
|
67 |
CE (Dist)/D-III/7500 |
15/03/2019 |
Distribution Circular Regarding Revised guidelines- Preparation of estimates for shifting of existing distribution electrical infrastructure due to road widening, construction of bridges, etc by National Highway Authority of India (NHAI), Public Works Department (PWD) , MSRDC, Railways, Local bodies, ec under DDF |
|
66 |
CE (Dist.)/ Solar/2472 |
24/01/2019 |
implementation of Mukhyamantri Saur Krushi Pump Yojana |
|
65 |
CE (Dist.)/ D-III/ NSC/30011 |
20/12/2018 |
Infrastructure Development for release of new connection |
|
64 |
CE (Dist.)/ D-III/ Ag./ DFF/30175 |
21/12/2018 |
Extending the facility of DDF for releasing Agricultural connection on HVDS and for conversion of existing Ag connection from LVDS to HVDS |
|
63 |
CE/MIVIC/MSC-I/29811 |
19/12/2018 |
Approved vendor list of LT Capacitors required for Agriculture pumps) |
|
62 |
CE (Dist.)/ D-IV/ C.No. 195 of 2017/ SoC/29320 |
14/12/2018 |
Corrigendum Circular No. 29320 – Schedule of charges (case No. 195 of 2017) |
|
61 |
CE (Dist.)/ Testing/ 40-200A Meter / Guidelines /25597 |
29/10/2018 |
Circular : Guidelines for proper installation of 40-200Amp CT Embedded Energy Meter for avoiding the PT missing event. |
|
60 |
CE (Dist.)/ D-III/ NHAI/ T-87/24724 |
19/10/2018 |
Additional guidelines for preparation of estimates for shifting of existing distribution electrical infrastructure due to road widening, construction of bridges etc, by National Highway Authority of India (NHAI), Public Water Department (PWD), Local Bodies, etc. |
|
59 |
CE (Dist.)/ D-IV/ C.No.195 of 2017/ SoC/23862 |
08/10/2018 |
Circular for revised Schedule of Charges (SoC) w.e.f. 1st Sept-2018, MERC Case No. 195 of 2017 dt. 08.10.2018. |
|
58 |
CE/Dist/T/Safety/EI/20529 |
24/08/2018 |
Circular-Guidelines for observing electrical safety and reduction in Accidents thereof. |
|
57 |
CE(Dist)/D-III/Non DDF Stoppage/147472 |
15/06/2018 |
Circular-Stoppage of Non- DDF CC&RF scheme for release of power supply to prospective consumers- Amendment to circular thereof. |
|
56 |
क्र. मु.अ. (वितरण)/डी-३/NHAI Circular/२३७९९ |
28/09/2017 |
परिपत्रक विषय – राष्ट्रीय महामार्ग प्राधिकरण, सार्वजनक बांधकाम विभाग, स्थानिक संस्था यांचेमार्फत रस्ता रुंदीकरण / नवीन रस्ते बांधणे / पुल बांधणी कामासाठी विद्युत वाहिनी स्थलांतर करताना मार्गदर्शक सुचना |
|
55 |
CE(Dist)/D-III/NSC/10992 |
15/05/2018 |
Circular- Infrastructure development for release of new connections |
|
54 |
CE/Testing/NET/ABT Meter/9692 |
26/04/2018 |
Circular- Utilization of existing installed ABT meter (SEM) as Net meter for Soalar rooftop projects. |
|
53 |
ED(Dist)/D-III/Non DDF Stoppage/9245 |
23/04/2018 |
Circular- Stoppage of Non DDF CC&RF scheme |
|
52 |
CE/Testing/HT-EHV/Metering/Circular/CM-CF/8378 |
16/04/2018 |
Circular- Guidelines regarding Metering in respect of HT/EHV consumers |
|
51 |
ED(Dist)/D-III/Physical verification of Assests/1593 |
22/01/2018 |
Circular for Physical verification of MSEDCL assets |
|
50 |
CE/Testing/Spare/CTPT insp./Std. Guidlines/1507 |
20/01/2018 |
Circular reagarding guidelines for keeping spare metering CTs and PTs in r/o EHV consumers/Generators |
|
49 |
CE/Dist/D-IV/MERC/31793 |
29/12/2017 |
Amendment in Circular No. 25079 dt. 12.10.2017, for refund of SLC, ORC & Meter Cost Refund to Consumers. |
|
48 |
CE/Dist/D-III/DTC Capacity & Metering /29874 |
07/12/2017 |
Use of commensurate capacity DTC and provision of DTC metering. |
|
47 |
CE/Dist/D-IV/MERC/25079 |
12/10/2017 |
Refund of SLC ORC Meter Cost to the consumers |
|
46 |
CE/Dist/D-IV/MERC/25079 |
12/10/2017 |
Circular – Refund of SLC, ORC & Meter Cost to consumers |
|
45 |
CE/Dist/D-III/23799 |
28/09/2017 |
Guidelines – Preparation of estimates for shifting of existing distribution electrical infrastructure due to road widening, construction of bridges etc. by National Highway Authority of India (NHAI), Public Works Deptt. (PWD), Local bodies, etc.) |
|
44 |
CE/MMC/SM/e-auction/002312 |
21/07/2017 |
Circular dtd. 21-07-2017 for Timely disposal of scrap/obsolete materials lying at various zones through e-auction |
|
43 |
मु.अ. (वितरण )/ग्रावि /परिपत्रक /१५८७१ |
07/06/2017 |
परिपत्रक : सन्माननीय लोक प्रतिनिधी यांना त्यांच्या विभागातील कामकाजाबाबत अवगत करण्याबाबत |
|
42 |
CE(Dist)/R-III/AG-Pump/DDF/14025 |
07/06/2017 |
Revised Guidelines for releasing new Agriculture connections under DDF scheme. |
|
41 |
CE/Testing/Star Rated/DT/9923 |
28/04/2017 |
Implementation of revised energy performance standard for Distribution Transformers up to 2500 KVA rating |
|
40 |
CE/DIST/D-IV/7846 |
06/04/2017 |
Circular Notified voltage |
|
39 |
CE/DIST/D-III/Circular/Safety/1084 |
17/01/2017 |
Circular – Preventive measures to reduce accidents |
|
38 |
CE/DIST/T/24615 |
03/08/2016 |
Guidelines for ensuring separate earthing of solar roof-top PV project and safety thereof |
|
37 |
CE(Dist)/D-III/MERC/SOC/399387 |
03/11/2007 |
Recovery of Supervision Charges |
|
36 |
CE(Dist)/D-IV/Centages/DDF works /24007 |
29/07/2016 |
Recovery of Centages for DDF Scheme Works |
|
35 |
CE(Dist)/D-III/Main Tran Cap less than 1000 kva/23650 |
27/07/2016 |
Maintenance schedule of transformers of capacities less than 1000 KVA |
|
34 |
CE(Dist)/D-III/Continuous Supply/HT Consumer/07388 |
04/03/2016 |
Maintaining continuous supply to HT Consumer by reducing Planned/Forced outages-Directives thereof |
|
33 |
CE(Dist)/D-III/Continuous Supply/HT Consumer/07388 |
04/03/2016 |
Maintaining continuous supply to HT Consumer by reducing Planned/Forced outages-Directives thereof |
|
32 |
CE(Dist)/D-III/43000 |
31/12/2015 |
Waival of 1.3% supervision charges of the works carried out by MIDC Authority under DDF schemes in MIDC / Industrial cluster area |
|
31 |
CE(Dist)/D-IV/39028 |
10/11/2015 |
पंचायत /ग्रामपंचायत कार्यालयात महावितरणचे अधिकारी व कर्मचारी यांची नावे व भ्रमणध्वनी क्रमांक असलेले फलक लावणेबाबत |
|
30 |
CE(Dist)/D-III/Req. of Land/39010 |
09/11/2015 |
Supplement to Circular No. CE(Dist)/D-III/Req. of Land/28792 Dt:17.07.2015 |
|
29 |
CE(Dist.)RE-III/Tenders/36360 |
3/10/2015 |
To Avoid Sending of un-necessary copies of correspondence to H.O. |
|
28 |
CE(Dist.)/RE-III/Tenders/33936 |
11/09/2015 |
Qualitative and Quantitative inspection of works carried out for Ag.Pump energization under special package and Backlog Funds. |
|
27 |
CE/Dist./32900 |
03/09/2015 |
Effective Implementation (Circular No.CE/Dist./32900 Dt.03.09.2015) |
|
26 |
CE(Dist.)/Ag pump/EE/RE-I/29874 |
31/07/2015 |
Task Force for Inspection of AG Energisation Works,under special package and Backlog scheme |
|
25 |
CE(Dist.)/D-III/29450 |
24/07/2015 |
Revision of Delegation of powers in case of administrative approval / sanction of DDF proposals costing more than Rs.10 Crs. |
|
24 |
CE(Dist)/D-III/Req. of Land/ 28792 |
17/07/2015 |
Revised Guidelines for Requirement of adequate land for Distribution Transformer Centers and Substations while releasing connection to
Residential/Commercial/Industrial etc. complexes/township/establishments, having multiple numbers of connections. |
|
23 |
Dir(O)/MSEDCL/SS&online Cap/28777 |
16/07/2015 |
CIRCULAR :Providing and maintaining 33/11KV Substation & HT Line Capacitors |
|
22 |
CE(Dist.)/R-III/Tenders/24267 |
28/05/2015 |
Agricultural Pump energization -Sub Division wise tender orders to be places at circle level-powers for Price Negotiations thereof |
|
21 |
CE(Dist.)/RE-III/Tenders/22784 |
21/05/2015 |
Modification in guidelines in common tender documents for Ag pump energization |
|
20 |
CE(Dist.)/D-IV/Unemployed Engrs Scheme/22200 |
15/05/2015 |
CIRCULAR :Allocation of Works by Lottery System to Unemployed Engineers |
|
19 |
CE(Dist.)/R-III/21521 |
08/05/2015 |
Action Plan for improvement in pro-active response/detail monitoring of various issues by Executive Engineer |
|
18 |
CE(Dist.)/D-III/EHV/Circular/27960 |
06/09/2014 |
Guidelines for framing proposals regarding Establishment of new EHV substations / Augmentation / Additional Power Transformers. |
|
17 |
CE(Dist.)/RE-III/Tenders/19875 |
20/06/2014 |
Guidelines for submission of proposals to AG. Turnkey Contracts.. |
|
16 |
CE(Dist.)/RE-III/Circular/16375 |
28/05/2014 |
Guidelines for Use of RSJ pole for erection of Transformer DP Structure. |
|
15 |
CE(Dist.)RE-1/Ag.PUMP/15531 |
19/05/2014 |
Chronological Order for releasing Ag Pump Connections. |
|
14 |
CE(Dist.)/RE-III/Tenders/20016 |
16/04/2015 |
Forwording of sample total turnkey tender document for Ag.pump energization. |
|
13 |
CE(Dist.)/RE/Ag.Pump/4900 |
12/02/2014 |
Revise Guidelines for releasing of new Agriculture connections. . . clarification thereof. |
|
12 |
Dir(proj)/3090 |
30/01/2014 |
Execution of paid pending Ag pump Energisation works under full turnkey contract |
|
11 |
CE(Dist.)/RE/Ag.Pump/3030 |
29/01/2014 |
Revise Guidelines for releasing of new Agriculture connections.. |
|
10 |
CE(Infra)/30208 |
11/11/2013 |
Inspection of Ag Pump energization works.. |
|
9 |
CEC/Coporate/BND 0240 |
25/02/2013 |
Enhancement in the limit of expenditure on hiring of vehicles for flying squads. |
|
8 |
CE/DIST-III/SOC/24500 |
30/08/2012 |
Revision in Schedule of Charges. |
|
7 |
CE/Dist/D-III/16037 |
08/06/2012 |
Redelegation of powers for technical sanction for works related to LT & HT connections under all schemes. |
|
6 |
CE/Dist/D-III/15754 |
06/06/2012 |
Requirement of adequate land for Distribution Transformer Centers and Substations while releasing connection to bigger societies/builders. |
|
5 |
CE(Dist)/D-III/Circular/25680 |
19/06/2008 |
Procedure to plan for electrifying areas preparation of schemes (DPRs) and releasing new connections |
|
4 |
CE(Dist)/D-III/Circular/25680 |
19/06/2008 |
राज्यातील निरनिराळ्या भागांच्या विद्युतीकरणासाठी योजना आखणे , तपशीलवार प्रकल्प अहवाल तयार करणे नवीन विद्युत जोडण्या देणे यासाठीची कार्यपद्धती |
|
3 |
|
20/05/2008 |
नवीन सेवा जोडण्या देण्याकरिता व क्षमता वाढ करण्याकरिता मार्गदर्शक सूत्रे |
|
2 |
CE(Dist)/D-III/Circular/22197 |
20/05/2008 |
Guidelines for releasing new connections and augmentation |
|
1 |
Ref : CE/Dist/D-III/MERC/ |
03/09/2007 |
Refund of meter cost |
|