Sr. No. Date Subject Reference No. View/Download
346 09-09-2024 Commercial Circular 346 dt. 09.09.2024 regarding Grant of Green Open Access to consumers availing power from Renewable Energy with green Attribute CE/Comm/Open Access/027851
345 01-08-2024 Commercial Circular No 345 Corrigendum II for Commercial Circular No 320 for EV Charging CE/Comm/Multiparty/EV/Corrigendum-II/ 23669
344 05-04-2024 Circular 344 -Applicability of Electricity Duty Exemption to Railway Monorail and Metrorail CE(Com)/ED Exemption/Mono/010689
343 27-03-2024 Rate at which the Interest is payable on Consumers Security Deposit for the Financial Year 2023-2024 CE(Com)/Int.on S.D/2023-2024/009750
342 10-07-2023 Corrigendum order dated 28/04/2023 in the matter of MTR Tariff Order in Case No. 226 of 2022 dated 31/03/2023. CE(Comm)/Tariff/MTR 23-25/020690
341 28-04-2023 Revision in Electricity Tariff w.e.f. 1st April 2023 for Control Period FY 2023-24 to FY 2024-25 and implementation thereof. CE(Comm)/Tariff/MTR 23-25/012368
340 06-04-2023 Rate at which the Interest is payable on Consumers’ Security Deposit for the financial year 2022-2023. CE(Com)/Int. on S.D/2022-2023/010164
339 19-10-2022 शासन निर्णय दि. २५/०८/२०२२ अन्वये अतिउच्चदाब, उच्चदाब व लघुदाब उपसा जलसिंचन योजना ग्राहकांना वीज दरात सवलत देण्याबाबत. क्र. मु.अ.(वा)/उपसा जलसिंचन योजना/०२७३९४
338 07-09-2022 विदर्भ, मराठवाडा, उत्तर महाराष्ट्र, डी व डी+ क्षेत्रातील उद्योगांना वीजदर सवलतीबाबतच्या शासन निर्णयाची अंमलबजावणी करण्याबाबत निर्गमित केलेल्या वाणिज्य परिपत्रक क्र.३३७ दि.०६/०७/२०२२ मध्ये सुधारणा करण्याबाबत क्र.मु.अ.(वा)/वि.म.सवलत/०२३३४७
337 06-07-2022 विदर्भ, मराठवाडा, उत्तर महाराष्ट्र, डी व डी+ क्षेत्रातील उद्योगांना सद्यस्थितीत शासनामार्फत देण्यात येत असलेल्या वीजदर सवलतीचे सुसूत्रीकरण करण्याबाबतचा दि.23/06/2022 च्या शासन निर्णयाची अंमलबजावणी करण्याबाबत. क्र.मु.अ.(वा)/वि.म.सवलत/१७९१३
336 16-03-2022 Commercial Circular 336 Additional Security Deposit from Consumer P(Com)/SoP/SD/ASD/6525
335 04-04-2022 Commercial Circular 335: Rate of Interest on SD for FY 2021-22 CE(Com)/Int.on S.D/2021-22/
334 17-03-2022 Guidelines in the matter of RE generators intending to connect their power plants
“Behind the meter” as per the provisions of MERC (Grid Interactive Rooftop
Renewable Energy Generating Systems) Regulations, 2019.
CE/Comm/GIRREGS Regulations 201/06633
333 06-05-2021 Levying “Green Power Tariff” to supply Renewable Energy to consumers opting for 100% green energy for meeting their entire demand CE/Comm/Green Power Tariff/9534
332 20-04-2021 Commercial Circular No.332 – Rate of Interest on Consumer Security Deposit for FY 2020-21 CE/COMM/Int.on S.D/F.Y.2020-21
331 19-01-2021 Implementation of MNRE’s Phase-ll of Grid Connected Rooftop Solar Program in
MSEDCL
CE/Comm/MNRE-RTS-Phase-ll/No.01419
330 13-11-2020 उच्चदाब आणि लघुदाब (अकृषक) ग्राहकांची थकबाकी वसूल करणे आणि त्यासंबधी जबाबदारी निश्चित करणेबाबत कार्यकारी संचालक (दे. व म.) / थकबाकी वसुली /१९४०८
329 01-09-2020 Commercial Circular 329 Revised Rates of Electricity Duty notified by GoM w.e.f. August 2020 P-Com/Electricity Duty/Revised Rates/14280
328 30-07-2020 Commercial Circular No, 328 CE/Comm/Multiparty/12891
327 03-07-2020 परिपत्रक – घरगुती ग्राहकांना वीज बिलात प्रचलित १% ऐवजी २% सवलत देणेबाबत दि ०३०७२०२० क्र. का. स. (दे. व म.) / २% सवलत / १२१३३
326 11-05-2020 MERC order dated 30.04.2020 in Case No. 79 of 2020 in respect of petition by MSEDCL for seeking clarification on certain issues of the MYT Order dated 30 March 2020 issued under Case No. 322 of 2019 CE/Comm/Tariff/MYT20-25/clarification/9530
325 27-04-2020 Corrigendum Order dated 23/04/2020 in the matter of MERC Order in Case No. 322 of 2019 dated 30 March 2020. CE/COMM/Tariff/MYT 20-25/9244
324 07-04-2020 Rate of Interest on Consumer’s Security Deposit for F.Y. 2019-20 CE/COMM/Int. on S.D./2019-20/9080
323 03-04-2020 Revision in Electricity Tariff w.e.f. 1st April 2020 and implementation thereof. [For Control Period FY 2020-21 to FY 2024-25] CE/COMM/Tariff/MYT20-25/9061
322 21-01-2019 connectivity to the Distribution network of MSEDCL for eligible consumers installing Rooftop Renewable Energy Generating Systems in his premises under MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019——- Procedure for Application, methodology for Metering & Billing, etc. CE/Comm/GIRREGS Regulations 2019/ No.02184 Date: 21.01.2019 Circular322

annexures 1

annexures 2

annexures 3

annexures 4

annexures 5

321 04-11-2019 Guidelines for Infrastructure development to release new connections-requirement of land for establishment of distribution transformer in case of augmentation at same place CE(Dist)/M-1/F-516/NSC-Augmentation/No 30441 Date: 04/11/2019
320 19-07-2019 Commercial circular no.320- Power supply to individual entrepreneurs coming under one premises through Multi-partite agreement for Textile and Non-Textile Industries CE/Comm/Multiparty/20286 Date: 19/07/2019
319 28-06-2019 Commercial circular no.319- Policy for refund of tariff difference amount to consumers through RTGS/ NEFT in their bank account, instead of adjusting the refund amount in their electricity bills. CE(Comm)/Refund Policy/18076 Date: 28/06/2019
318 26-06-2019 Commercial Circular No 318 – Procedural guidelines regarding IT- ITES Park and IT Units CE(Comm)/Tariff/17759 Date: 26/06/2019
317 25-06-2019 Commercial Circular No 317 – Guidelines on Submission of Electricity Duty (ED) and Tax on sale (TOSE) information to Electrical Inspector Offices and GoM P-Com/ED & TOSE/17593 Date: 25/06/2019
316 11-03-2019 Commercial Circular-316 Guidelines in respect of finalizing cases under section 126 the Electricity Act 2003, P-Com/126/6929 Date: 11/03/2019
315 07-03-2019 Commercial Circular-315 Standard packages (One time Settlement and Installment) for prospective consumers who have purchased the premises (having MSEDCL dues) through proceeding of High Court/DRT/NCLT/Liquidator/Judicial/Statutory authorities and requested for new electricity supply P-Com/Recovery/6661 Date: 07/03/2019
314 06-03-2019 Commercial Circular-314 Revision in rate of HT-AG-LIS CE(Comm)/6501 Date: 06/03/2019
313 16-01-2019 Commercial Circular-313 Revision in rate of ToSE P-Com/1550 Date: 16/01/2019
312 15-01-2019 Commercial Circular No.312 : Revised guidelines for billing in view of various MERC orders CE(Comm)/Tariff/1398 Date: 15/01/2019
311 01-10-2018 Commercial Circular No.311 : Revision in Electricity Tariff w.e.f. 1st September 2018 and Implementation thereof. [For control period 2018-19 (From Sep 2018) and 2019-20]. P-Comm/Tariff/23347 Date: 01/10/2018
310 20-08-2018 Commercial Circular No.310 : Third Amendment to Comm. Cir. No. 258 dated: 25.01.2016 in the matter of MERC (Net Metering for Roof-top Solar Photo Voltaic Systems) Regulations, 2015— Procedure for Application, methodology for Metering & Billing, etc. CE/Comm./Solar Net metering/3rd Amendment /20173 Date: 20/08/2018
309 03-08-2018 Commercial Circular No.309 : Release of connections with multiple metering p in respect of consumers in Distribution Franchisee through MOU route area having vertical bus risers. PR3/Cos/DF(MOU)/18902 Date: 03/08/2018
308 28-06-2018 Commercial Circular No.308 : Revision in Allowable Distribution Losses and Reimbursement Charges of Distribution Franchisee through MOU route in Urban Township area. PR3/Cos/DF(MOU)/15733 Date: 28/06/2018
307 07-06-2018 Commercial Circular No.307 : SECOND AMENDMENT TO COMMERCIAL CIRCULAR NO.258 CE/Comm./Solar Net metering/2nd Amendment/14080 Date: 07/06/2018
306 01-06-2018 Commercial Circular No.306 : शासकीय निवासस्थानी राहणाऱ्या अधिकारी /कर्मचारी यांनी निवासस्थान सोडताना महावितरणकंपनीकडून वीज देयकाची थकबाकी नसल्याबद्दलचे प्रमाणपत्र संबंधित कार्यालयाकडे सादर करण्याबाबत ED(Billing)/12001 Date: 01/06/2018
305 25-05-2018 Commercial Circular No.305 : Revised Online Bill correction procedure for immediate implementation ED(Billing)/12001 Date: 25/05/2018
304 21-05-2018 COMMERCIAL CIRCULAR NO.304 : “AMNESTY SCHEME – 2018” for Permanently Disconnected HT/LT Industrial Consumers. P-Com/Amnesty Scheme/11465 Date: 21/05/2018
303 26-04-2018 COMMERCIAL CIRCULAR NO.303 : Setting time frame along with roles and responsibilities for the process of determining Captive Power Plant (CPP) status CE/Comm/Open Access/Captive Status/9680 Date: 26/04/2018
302 31-03-2018 COMMERCIAL CIRCULAR No.302 : Revision in Electricity Tariff with effect from 1 April, 2018 and Implementation thereof. CE (COmm.)/Tariff/06990 Date: 31/03/2018
301 31-01-2018 वाणिज्य परिपत्रक क्र.३०१ : विदर्भ, मराठवाडा ,उत्तर महाराष्ट्र, D व D+ क्षेत्रातील औद्योगिक ग्राहकांच्या वीज दरातील सवलतीबाबत सुधारित आदेश PR-3/Subsidy/2202 Date: 31/01/2018
300 17-01-2018 वाणिज्य परिपत्रक क्र.३०० : विषय : २०१७ च्या खरीप हंगामामध्ये राज्यातील तालुक्यांमध्ये दुष्काळ घोषित करून विविध उपाय योजना व मदत जाहीर करणेबाबत : कृषिपंपाच्या चालू बिलात ३३.५% सूट व टंचाई जाहीर केलेल्या गावात शेतकऱ्यांच्या शेतीपंपाची वीजजोडणी खंडित ना करण्याबाबत PR-3/Subsidy/1229 Date: 17/01/2018
299 28-12-2017 वाणिज्य परिपत्रक क्र.२९९ : शेतकऱ्यांसाठी सुरळीत वीज पुरवठा , योग्य वीज देयक व शासन सवलतीच्या दरानुसार वीज देयक वसुली. ED Billing/AG /31725 Date: 28/12/2017
298 16-12-2017 COMMERCIAL CIRCULAR No.298 (Amendment to Commercial Circular No.224) : Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) Regulations, 2014 -Implementation thereof. Co-ord cell/LT Ext/30852 Date: 16/12/2017
297 24-11-2017 COMMERCIAL CIRCULAR No.297 : revised guidelines for releasing LT Industrial connection up to 150 KVA. Co-ord cell/LT Sanction/028919 Date: 24/11/2017
296 24-11-2017 वाणिज्य परिपत्रक क्र.२९६ : “मुख्यमंत्री कृषी संजीवनी योजना २०१७” योजनेत सहभागी होण्यासाठी शेतकऱ्यांना सवलत Date: 24/11/2017
295 18-11-2017 वाणिज्य परिपत्रक क्र.२९५ : कृषी ग्राहकांकडील वीज बिल थडबाकीमध्ये सवलत देण्यासाठी “मुख्यमंत्री कृषी संजीवनी योजना २०१७” ला मुदतवाढ देण्याबाबत Date: 18/11/2017
294 01-11-2017 वाणिज्य परिपत्रक क्र.२९४ : कृषी ग्राहकांकडील वीज बिल थकबाकीमध्ये सवलत देण्यासाठी “मुख्यमंत्री कृषी संजीवनी योजना २०१७” Date: 01/11/2017
293 13-09-2017 COMMERCIAL CIRCULAR No.293 : Residential & Agricultural Amnesty Scheme 2018. P-Com/Accts/R&A Amnesty/22201 Date: 13/09/2017
292 13-07-2017 COMMERCIAL CIRCULAR No.292 : Tariff of Renewable Energy Projects for the period from 1st April 2017 to 31st March 2018. CE/PP/NCE/Tariff/17046 Date: 13/07/2017
291 29-06-2017 Commercial Circular 290 : Revised-delegation of powers in respect of Load sanction, Estimate sanction, Inspection of HT consumer installation, fixing of point of supply, approval of SLD and metering specification thereof & Procedure for release of new HT Connections. ED (Dist-II)IHT-Conn/Metering/15940 Date: 29/06/2017
290 21-06-2017 Commercial Circular 290 : Incentive to Retired Employees of MSEDCL for PD Recovery P-Com/Accts/PD Amnesty/015311 Date: 21/06/2017
289 06-06-2017 वाणिज्य परिपत्रक क्र.२८९ : विदर्भ, मराठवाडा ,उत्तर महाराष्ट्र, D व D+ क्षेत्रातील औद्योगिक ग्राहकांच्या वीज दरातील सवलतीबाबत सुधारित आदेश PR-3/Subsidy/13982 Date: 06/06/2017
13811 03-06-2017 Commercial Circular No.13811 : Foremost steps to be taken to wipe out average / faulty / abnormal billings CMD/MSEDCL/13811 Date: 03/06/2017
288 12-05-2017 Commercial Circular No.288 : Guide Book for actions regarding theft of electricity u/s 135 and u/s 126 of Electricity Act, 2003. P-Com/Theft/Guide Book/11119 Date: 12/05/2017
287 29-04-2017 Commercial Circular No.287 : Extension of Nav Prakash Yojana FY 2016-17. P-Com/ Accts/PD-Amnesty/10019 Date: 29/04/2017
286 27-04-2017 Commercial Circular No.286 : Revised guidelines regarding sanction of LT connection within seven days. Co-ord cell/LT Sanction/09761 Date: 27/04/2017
285 18-04-2017 Commercial Circular No.285 : Calibrated actions in respect of Collection Efficiency and Billing Efficiency. P-Com/ Accts/08787 Date: 18/04/2017
284 11-04-2017 Commercial Circular No.284 : Revision in Electricity Tariff with effect from 1st April 2017 and Implementation thereof. CE (Comm.)/Tariff/7891 Date: 11/04/2017
283 17-03-2017 विषय : महाराष्ट्रातील पाणी पुरवठा योजनांना वीज बील भरण्यास द्यावयाच्या सवलीबाबत. पी -कॉम/लेखा /पाणी पुरवठा/सवलत/NO -६०६२ दिनांक : १७-०३-२०१७
282 28-02-2017 Commercial Circular No.282 : Extension of period of “Nav Prakash Yojana 2016-17” P-COM/Accts/04658 Date: 28/02/2017
281 28-02-2017 Commercial Circular No.281 : 100% use of Online system for Industrial & Commercial consumers for New Connections and Load enhancement / reduction. Co-ord celI/Online System/04681 Date: 28/02/2017
280 04-12-2017 Amalgamation of load sanction circular No.225 and CE/Dist/D-III/16037 dated 08.06.2012 & processing of applications through online process only. P-COM/NSC/ 02667 Date: 04/12/2017
278 20-06-2016 Inspection of internal installations by Third Party PR-3/COS/ 19478 Date: 20/06/2016
277 04-01-2017 Commercial Circular No.277 : Modification Nav Prakash Yojna 2016-17 P-Com/Accts/000203 Dt. 04/01/2017
276 19-11-2016 Commercial Circular No.276 : (Amendment to Commercial Circular No.258) CEPP/NCE/SoIar/Net metering/Amendment/34477 Dt. 19/11/2016
275 18-11-2016 Commercial Circular No.275 : Revision in Electricity Tariff – Implementation thereof. CE (Comm.)/Tariff/ 34460 Dt. 18/11/2016
274 11-11-2016 Commercial Circular No.274 : About Residential Electricity Connection P-Com/Residential Electricity Connection/33905 Dt. 11/11/2016
273 10-11-2016 Commercial Circular No. 273 : Revised Rates of Electricity Duty Notified by the GoM wef Sept. 2016. P-Com/Accts/Elect Duty/033861 Dt. 10/11/2016
272 10-11-2016 Commercial Circular No.272 : Withdrawal of legal tender character of existing Rs.500/- & 1000/-Bank notes and extension of due date & time limit for prompt payment discount for LT consumers P-Com/Accts/Billing/33798 Dt. 10/11/2016
271 15-10-2016 Commercial Circular No.271 : Revision in transmission charges and transmission losses for open Access consumer CE/Comm/OA/Tr charges/31439 Dt. 15/10/2016
270 10-10-2016 Commercial Circular No.270 : Guidelines for Implementation of Amnesty Scheme for PD Consumers 2016-17 P-Com/Accts/31133 Dt. 10/10/2016
269 27-09-2016 Commercial Circular No.269 : Amnesty Scheme for PD Consumers 2016-17 P-Com/Accts/029536 Dt. 27/09/2016
268 27-09-2016 Commercial Circular No.268 : Maharashtra Duty Act,1958 regarding charging of Electricity Duty & its Refund P-Com/Accts/Elect Duty Refund/029535 Dt. 27/09/2016
267 04-08-2016 Circular No.267 : Tariff of Non-conventional Energy (NCE)/ Renewable Energy (RE) Projects for the period from 1st April 2016 to 31st March 2017. CE/Comm/CP/NCE/Tariff/24772 Dt. 04/08/2016
266 30-07-2016 Circular No.266 : Concession to Industrial consumers in Vidharbha, Marathwada, North Maharashtra, D and D+ region PR-3/Subsidy/24229 Dt. 30/07/2016
265 03-06-2016 सन २०१५-१६ च्या रब्बी हंगामातील पिकांची हुंगामी पैसेवारी ५० पैस्यापेक्षा कमी असलेल्या गावांमद्दे विविध उपाययोजना जाहीर करणेबाबत – वीज बिलात ३३. ५% इतकी सूट व दुष्काळसदृश परिस्तीथी जाहीर केलेल्या गावातील कृषीपम्पाचा वीज पुरवठा खंडित ना करणे. पीआर – ३/सबसीडी /१७९८४ दिनांक : ०३-०६-२०१६
264 06-05-2019 वीज चोरी प्रकरणातील ग्राहकांच्या वीज कायदा – २००३ कलाम १३५ अन्वये घडलेल्या गुन्ह्याच्या तडजोड अर्जाबाबत मार्गदर्शक सूचना(तत्वे) पी -कॉम/ १३७१४ दि . ६-०५-२०१६
263 26-04-2016 Exemption of Electricity Duty to New Information Technology or Information Technology Enabled Services (IT or ITES)Units P-Com/Accts/Elect Duty/011866 Dt. 26/04/2016
262 15-03-2016 MERC Clarificatory Order dt. 29/01/2016 in the matter of Tariff Order dt. 26/06/2015 in Case No. 121 of 2014. – Corrigendum to Commercial Circular No. 243 dt. 03/07/2015. PR-3/Tariff/8054 Dt. 15/03/2016
261 10-03-2016 फीडर व्यवस्थापक योजनां -मार्गदर्शकतत्वे (वाणिज्य परिपत्रक क्र.२३९ शुद्धिपत्र ) क्र .फिडर व्यवस्थापक योजना/७७४९ दि . १०-०३-२०१६
260 26-02-2016 Tariff of Non-conventional Energy (NCE)/ Renewable Energy (RE) Projects for the period from 10th November 2015 to 31st March 2016. CE/Comm/CP/NCE/Tariff/6699 Dt. 26/02/2016
259 06-02-2016 Revival of Help Desk for HT Consumer Co.ord Cell/HT/Help Desk/4273 Dt. 06/02/2016
258 25-01-2016 Connectivity to the Distribution network of MSEDCL for Consumers installing solar PV projects/systems below 1 MW on Rooftop or any mounting structure in their premises under the MERC (Net Metering for Roof-top Solar Photo Voltaic Systems) Regulations, 2015— Procedure for Application, methodology for Metering & Billing, etc. Comm/CP/Solar-Net metering/3051 Dt. 25/01/2016
257 20-01-2016 राज्यातील यंत्रमागधारक ग्राहकांना पुरविण्यात येणाऱ्या विजेच्या दारात सुधारणा करणेबाबत पीआर – ३/सबसीडी /२७४० दि . २0-01-२०१6
256 22-12-2015 सन २०१५-१६ च्या खरीप हंगामातील पिकांची हंगामी पैसेवारी ५० पैशापेक्षा कमी असलेल्या गावांमद्दे विविध उपाययोजना जाहीर करणेबाबत क्र . पीआर – ३/सबसीडी /४२४४७ दि . २२-१२-२०१५
255 07-12-2015 शासकीय (महावितरणचे कामकाज )सोयी / सुविधांकरिता शपथपत्राऐवजी स्वघोषणापत्र व कागदपत्रांच्या स्वयंसाक्षांकित प्रति स्वीकारणेबाबत . पी -कॉम/स्वयंसाक्षांकित/ ४१०४० दि . ०७-१२-२०१५
254 07-12-2015 Average And Excessive Billing P-COM/ACCT/BILLING/041037 Dt. 07/12/2015
253 26-11-2015 सन २०१५-१६ च्या खरीप हंगामातील पिकांची हंगामी पैसेवारी ५० पैशापेक्षा कमी असलेल्या गावांमद्दे विविध उपाययोजना जाहीर करणेबाबत क्र .पीआर – ३/सबसीडी /४०१४१ दि . २६-११-२०१५
252 24-11-2015 राज्यातील पाणी पुरवठा योजनांसाठी “पेयजल पाणी पुरवठा संजिवनी योजना -२०१५”राज्यात लागू करण्याबाबत. क्र .पीआर – ३/पेयजल पाणी पुरवठा संजिवनी योजना/४०१२८ दि . २४-११-२०१५
251 24-11-2015 कृषी ग्राहकांकडील वीज बिल थकबाकींमध्ये सवलत देण्यासाठी “कृषी संजीवनी योजना २०१४”ला दि. ३१-०३-२०१६.पर्यंत मुदतवाढ देणेबाबत. क्र .पीआर – ३/कृषी संजीवनी २०१४/४०१२७ दि . २४-११-२०१५
250 15-10-2015 Corrigendum to Commercial Circular No. 224 dt. 05.07.2014. Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution licensees, Period for Giving Supply and Determination of Compensation)Regulations, 2014.- Implementation thereof PR-3/COS/SoP/36694 Dt. 15/10/2015
249 19-09-2015 Grant of Open Access to Consumers sourcing power from Renewable energy generators (Such as Wind, Biomass, Bagasse, Solar, Small Hydro etc.) — Procedure for Application, levy of Cross Subsidy Surcharge, Standby supply charges & Additional Charges, Metering & Billing, etc. Comm/CP/RE-Open Acess/34457 Dt. 19/09/2015
248 11-09-2015 धार्मिक उत्सवांना तात्पुरत्या स्वरूपात वीज पुरवठा करणेबाबाबत क्र .पीआर – ३/टॅरिफ /३३९०७ दि . ११-०९-२०१५
247 25-08-2015 Revised Guidelines regarding Sanction & Release of Loads without NoC from MSETCL. PR-3/Co-ord Cell/Load Sanction/32086 Dt. 25/08/2015
246 11-08-2015 Permission for change of consumer tariff category from HT-Continuous to HT-Non-Continuous- Procedure thereof. PR-3/Tariff/30803 Dt. 11/08/2015
245 15-10-2015 On-line Facilities available to prospective consumers and reduction in number of documents to be submitted along with the Application for power supply PR-3/COS/SoP/36694 Dt. 15/10/2015
244 01-08-2015 राज्यात माहे फेब्रुवारी व मार्च ,२०१५ मध्ये अवेळी पाऊस व गारपीट यामुळे झालेल्या जीवित व वित्तहानीपोटी आपद्ग्रस्तांना मदत व सवलत देण्याबाबत. कृषिग्राहकांना तिमाही वीज बिलात माफी. क्र .पीआर – ३/सबसीडी /२९९१२ दि . १-०८-२०१५
243 03-07-2015 Revision in Electricity Tariff w.e.f. 1 June 2015 – Implementation thereof PR-3/Tariff/27641 Dt. 03/07/2015
242 20-05-2015 राज्यात माहे नोव्हेंबर व डिसेंबर, २०१४ मध्ये अवेळी पाऊस व गारपीट यामुळे झालेल्या जीवित व वित्तहानीपोटी आपद्ग्रस्तांना मदत व सवलत देण्याबाबत. क्र .पीआर – ३/सबसीडी /२२५६२ दि . २०-०५-२०१५
241 18-05-2015 महाराष्ट्र शुल्क अधिनियम, १९५८ विद्युत शुल्क वसुली व परताव्याबाबत क्र .पी -कॉम/विद्युत शुल्क/ २२४१३ दि . १८-०५-२०१५
240 02-05-2015 Revised Guidelines regarding Standars of Performance (SoP) No. Co-Ord Cell/Make in India/21283 Dt. 02/05/2015
239 02-05-2015 फीडर फ्रॅंचाईजी व्यवस्थापक योजना -सुधारित मार्गदर्शकतत्वे क्र .फिडर व्यवस्थापक योजना/२१२८२ दि . ०२-०५-२०१५
238 20-04-2015 फीडर फ्रॅंचाईजी व्यवस्थापक योजना – मार्गदर्शकतत्वे दि . २०-०४-२०१५
237 12-01-2015 महावितरण कंपनीच्या कृषी ग्राहकांना वीज दरात सवलत देण्याबाबत क्र .पीआर – ३/सबसीडी /९६९ दि . १२-०१-२०१५
236 26-12-2014 महावितरण कंपनीच्या औद्योगिक ग्राहकांना डिसेंबर २०१४ च्या वीज दरात सवलत देण्याबाबत. No. PR-3/Subsidy/38339 Dt. 26/12/2014
235 20-12-2014 सन २०१४-१५ च्या खरीप हंगामातील पिकांची हंगामी पैसेवारी ५० पैशापेक्षा कमी असलेल्या गावांमद्दे विविध उपाययोजना जाहीर करणेबाबत – वीज बिलात ३३. ५% इतकी सूट व दुष्काळसदृश परिस्तीथी जाहीर केलेल्या गावातील कृषीपम्पाचा वीज पुरवठा खंडित न करणे. No. PR-3/Subsidy/37828 Dt. 20/12/2014
234 20-12-2014 कृषी ग्राहकांकडील वीज बिल थकबाकींमध्ये सवलत देण्यासाठी “कृषी संजीवनी योजना २०१४”ला मुदतवाढ देणेबाबत. PR-3/Krishi Sanjivani-2014/37827 Dt. 20/12/2014
233 04-12-2014 सन २०१४-१५ च्या खरीप हंगामातील पिकांची हंगामी पैसेवारी ५० पैशापेक्षा कमी असलेल्या गावांमद्दे विविध उपाययोजना जाहीर करणेबाबत – वीज बिलात ३३. ५% इतकी सूट व दुष्काळसदृश परिस्तीथी जाहीर केलेल्या गावातील कृषीपम्पाचा वीज पुरवठा खंडित न करणे . No. PR-3/Subsidy/35804 Dt. 04/12/2014
232 20-10-2014 विशेष अबाहय योजनेला (स्पेशल अमेनिस्टी स्कीम )मुदतवाढ करून देण्याबाबत. No. PR-3/Abhay Yojana/31831 Dt. 20/10/2014
231 07-10-2014 Levy of Transmission Charges & Losses for Open Access RUC/OA/Tr.Charges/30596 Dt. 07/10/2014
230 15-09-2014 Applicability of HT/LT PWW Tariff for MIDC’s Water Works & Sewage Treatment Plant PR-3/Tariff/28796 Dt. 15/09/2014
229 12-09-2014 कृषी ग्राहकांकडील वीज बिल थकबाकींमध्ये सवलत देण्यासाठी “कृषी संजीवनी योजना २०१४”ला मुदतवाढ देणेबाबत. PR-3/Krishi Sanjivani-2014/28636 Dt. 12/09/2014
228 10-09-2014 Tariff of Non-conventional Energy (NCE)/ Renewable Energy (RE) Projects for FY 2014-15. Comm/CP/NCE/Tariff/28362 Dt. 10/09/2014
227 05-09-2014 राज्यातील १२३ तालुक्यात टंचाई परिस्तिथी जाहीर करण्यात आलेल्या गावातील कृषी ग्राहकांना वीज बिलात ३३% सवलत देण्याबाबत PR-3/Subsidy/27769 Dt. 05/09/2014
226 20-08-2014 Compulsory use of Online New Connection System (NC) for New Connections and Load enhancement / reduction of existing Consumers. Ref. No. Dir.(Operations)/Comm/26138 Dt. 20.08.2014
225 05-07-2014 Re-delegation of powers in respect of load sanction No. Co-ord cell/Re-delegation of power/21383 Dt. 05/07/2014
224 05-07-2014 Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) Regulations, 2014. – Implementation thereof PR-3/Tariff/21382 Dt. 05/07/2014
223 20-06-2014 कृषी ग्राहकांकडील वीज बिल थकबाकींमध्ये सवलत देण्यासाठी “कृषी संजीवनी योजना २०१४” PR-3/Krishi Sanjivani-2014/19900 Dt. 20/06/2014
222 02-04-2014 राज्यात माहे फेब्रुवारी व मार्च २०१४ मध्ये अवेळी पाऊस व गारपीटीमुळे शेती/फळ पिकांचे झालेल्या नुकसानीकरता विशेष पॅकेजद्वारे वीज बिळात सूट देणेबाबत. क्र .पीआर – ३/सबसीडी /१०८३६ Dt. 02/04/2014
221 15-03-2014 Applicability of Interim Charges, GENCO Charge & TRANSCO Charge to be levied to all consumer categories for 12 months as per MERC Orders. PR-3/Tariff/9001 Dt. 15/03/2014
220 01-03-2014 Corrigendum to Commercial Circular No. 194 dated 09.04.2013 in the matter of Grant of Open Access to Consumers Sourcing power from Renewable energy generators (Such as Wind, Solar, Small Hydro, Bagasse, Biomass etc.) — Procedure for Application, levy of Cross Subsidy Surcharge, Standby Charges & Additional Charge, Metering & Billing, etc. CE/Comm/CP/RE-OA/7274 Dt.01/03/2014
219 28-02-2014 Guidelines for converting single point supply consumers to Distribution Franchise through MOU route CE-Comm/CP/DF/6738 Dt. 28/02/2014
218 18/02/20144 Concession in Electricity Tariff by Govt. of Maharashtra PR-3/Tariff/5791 Dt. 18/02/20144
217 17-01-2014 Special Amnesty Scheme (Vishesh Abhay Yojana) under Maharashtra Industrial Policy 2013 for closed industrial units which are beyond the scope of rehabilitation – Delegation of Powers forimplementation of scheme. PR-3/Special Amnesty Scheme/1492 Dt. 17/01/2014
216 07-12-2013 Regarding revised Cross Subsidy Surcharge (CSS) applicable for Open Access consumer with effect from 1st September 2013 upto 28th February 2014. No. CE/Comm/CP/CSS/33296 Dt. 07/12/2013
215 18-11-2013 Corrigendum to Commercial Circular No. 213 dt. 10/10/2013.-Write off of Bad Debts in respect of Rural / Urban Public Water Works held by LSG and LIS operated by Co-operative Societies where decree is not executed. PR-3/Abhay Yojana/31182 Dt. 18/11/2013
214 10-10-2013 Increase in Time of Day (ToO) rebate for off-peak consumption. – Continuing for further period from 1 October, 2013 till the issuance of new Tariff Order. PR-3/Tariff/28283 Dt. 10/10/2013
213 10-10-2013 1) Write off of Bad Debts in respect of Rural/Urban Public Water Works (Live and PDconsumers) where decree is not executed. 2) Extension to the due date of “Abhay Yojana” for further period of six months upto 31st March,2014 PR-3/Abhay Yojana/28175 Dt. 10/10/2013
212 01-10-2013 Guidelines regarding applicability of tariff for IT and ITES Units. PR-3/Tariff/27481 Dt. 01/10/2013
211 01-10-2013 Special Amnesty Scheme (Vishesh Abhay Yojana) under Maharashtra Industrial Policy 2013 for closed industrial units which are beyond the scope of rehabilitation. PR-3/Special Amnesty Scheme/27480 Dt. 01/10/2013
210 16-09-2013 Redressal of cases where the bills are issued even after permanent disconnection. PR-3/COS/25698 Dt. 16/09/2013
209 07-09-2013 Recovery of Additional Energy Charges and Additional FAC- Implementation of MERC Orders thereof. PR-3/Tariff/25287 Dt. 07/09/2013
208 06-09-2013 New Tariff Category “HTX-Ports” applicable w.e.f. 1st August 2012. REF. PR-3 / TARIFF/ NO 25134 Dt. 06/09/2013
207 02-08-2013 Change of Category of Consumer, who runs Small Business from part of Residential Premises. PR-3/Tariff/24539 Dt. 02/08/2013
206 22-08-2013 Revision of Compounding Charges payable as per sec. 152 of Electricity Act-2003 CE/Comm/23646 Dt. 22/08/2013
205 17-08-2013 धार्मिक उत्सवांना तात्पुरत्या स्वरूपात वीज पुरवठा करणेबाबत. PR-3/Tariff/23085 Dt. 17/08/2013
204 08-08-2013 Procedure for refund of Electricity Duty to Duty Exempted Consumers. P-Com/Accts/ED-Exmp/22550 Dt. 08/08/2013
203 16-07-2013 Application of “HT IX – Public Service” Tariff Category to “Spiritual Organisation which are service oriented” w.e.f. 1st August 2012. PR-3/Tariff/19768 Dt. 16/07/2013
202 08-07-2013 Ref: 1. Commercial Circular No. 133 dated 15.02.2011. 2. Government Notification dated 14 May 2013. No. P-com /Theft / ti 1 9 1 4 0 Date: 08 JUL 2013
201 08-07-2013 31st March 2012 under “Abhay Yojana” in respect of Rural/Urban Public Water Works (Live and PD consumers). REF.PR-3/Abhay Yojana/ MJ1 9 1 3 8 REF.PR-3/Abhay Yojana/ MJ1 9 1 3 8
200 05-07-2013 Section 126: Unauthorized use of electricity – guidelines thereof. No. P-com / Theft / no 18884 Dt. 05/07/2013
199 25-06-2013 Corrigendum to Commercial Circular No.190 dated 14.03.2013 and 194 dated 09.04.2013 in the matter of CSS applicable to RE open access. CE/Comm/CP/CSS/Corrigendum/ 17728 Dt. 25/06/2013
198 12-06-2013 Levy of transmission charges and losses for Open Access. Comm/SOC/OA/Tr.Charges/16711 Dt. 12/06/2013
197 09-05-2013 सन २०१२-१३ च्या रब्बी अंतिम हंगामातील ५० पैशापेक्षा कमी अंतिम पैसेवारी असलेल्या टंचाईग्रस्त परिस्तीथी जाहीर करण्यात आलेल्या गावातील कृषिग्राहकांना वीज बिलात ३३. ५% सवलत देणेबाबत. PR-3/SUBSIDY/12434 Dt. 09/05/2013
196 29-04-2013 Tariff of Non-coventional Energy(NCE)/ Renewable Energy Projects for FY 2013-14 CE/COMM/CP/NCE/Tariff/11675 Dt .29.04.2013
195 15-04-2013 Inclusion of Live and P.D. Street Light Connections of Mahanagar Palika & Nagar Palika and Live HT LIS & Extension to “Abhav Yojana” for implementation thereof. PR-3/Abhay Yojana/105174 Dt. 15/04/2013
194 09-04-2013 Grant of Open Access to Consumers Sourcing power from Renewable Energy Generators (Such as Wind, Solar, Small Hydro) — Procedure for Application, levy of Cross Subsidy Surcharge, Standby Charges & Additional Charge, Metering & Billing, etc. CE/Comm/CP/Open Access/ RE/ 10075 Dt. 09/04/2013
193 02-04-2013 Monitoring of B-80 proposals by Zone, Circle and Division offices P-Com/Accts/B-80/9307 Dt. 02/04/2013
192 01-04-2013 Increase in Time of Day (ToD) rebate for off-peak consumption. – Continuing up to September 2013 there off. PR-3/Tariff/9257 Dt. 01/04/2013
191 20-03-2013 Clarification regarding Directives under Commercial Circular No.143 PR-3/COS/DF/8207 Dt. 20/03/2013
190 14-03-2013 Regarding revised Cross Subsidy Surcharge (CSS) applicable for Open Access consumer. CE/Comm/CP/CSS/ 7511 Dt. 14/03/2013
189 12-03-2013 सन २०१२-१३ च्या खरीप हंगामातील ५० पैशापेक्षा कमी अंतिम पैसेवारी असलेल्या टंचाईग्रस्त परिस्तीथी जाहीर करण्यात आलेल्या गावातील कृषिग्राहकांना वीज बिलात ३३. ५% सवलत देणेबाबत. PR-3/Subsidy/7260 Dt. 12/03/2013
188 05-03-2013 यंत्रमागधारकांना पुरविण्यात येणाऱ्या शासनाच्या सवलतींच्या वीज दरात सुधारणा करणेबाबत. PR-3/Subsidy/6700 Dt. 05/03/2013
187 15-02-2013 Online New Connection & Web Self Service Systems PR-3/COS/5091 Dt. 15/02/2013
185 01-02-2013 Levy of transmission charges and losses for Open Access Comm/SOC/OA/Tr. Charges/3357 Dt. 01/02/2013
184 11-01-2013 टंचाईग्रस्थ गावातील स्वतंत्र ग्रामीण पाणीपुरवठा योजनांच्या दि १ एप्रिल २०१२ पासूनच्या चालू वीज देयकाचा भरणा कारणाच्या शासनाच्या तरतुदीबाबत. PR-3/Subsidy/839 Dt. 11/01/2013
183 04-01-2013 Increase in Time of Day (ToO) rebate for off-peak consumption. PR-3/Tariff/333 Dt. 04/01/2013
182 05-12-2012 Extension to the due date of “Abhay Yojana” for Recovery of arrears PR-3/Tariff/33662 Dt. 05/12/2012
181 12-12-2012 यंत्रमागधारकांना पुरविण्यात येणाऱ्या शासनाच्या सवलतींच्या वीज दरात सुधारणा करणेबाबत. PR-3/Subsidy/34342 Dt. 12/12/2012
180 05-12-2012 Application of tariff category to Printing Press. PR-3/Tariff/33662 Dt. 05/12/2012
179 01-12-2012 यंत्रमागधारकांना पुरविण्यात येणाऱ्या शासनाच्या सवलतींच्या वीज दरात सुधारणा करणेबाबत. क्र. पी .आर -३/सबसिडी /No 33247 Dt. 01/12/2012
178 16-11-2012 कृषीपंपधारक ग्राहकांना पुरविण्यात येणाऱ्या शासनाच्या सवलतींच्या वीज दरात सुधारणा करणेबाबत. क्र. पी .आर -३/सबसिडी /No 32019 Dt. 16/11/2012
177 25-09-2012 Change of Category of Commercial/Industrial Consumers. PR-3/Tariff/27190 Dt. 25/09/2012
176 14-09-2012 कृषी ग्राहकांकडील थकबाकी वसुलीकरता “कृषी संजीवनी योजना – २०११” ची अंबलबजावणी व शेवटचे वीज देयक करणेकरीता अंगारलेली पध्दत. PR-3/Krishi Sanjivani/26424 Dt. 14/09/2012
175 05-09-2012 Revision in Electricity Tariff – Implementation thereof. HT – LT Tariff Booklet PR-3/Tariff/25230 Dt. 05/09/2012
174 05-09-2012 Schedule of charges along with applicable wheeling charges and losses for OpenAccess in the FY2012-13. Comm/SOC/OA/25229 Dt. 05/09/2012
173 26-07-2012 Accounting of auxiliary consumption on feeders going to MSPGCLfrom MSETCL/MSEDCL Sub Stations & netting off thereof. PR-3/General/21463 Dt. 26/07/2012
172 30-06-2012 Extension for implementation of “Abhay Yojana”. – Change in cut-off date to write off of bad debt of PD AG consumer. PR-3/Abhay Yojana/18317 Dt. 30/06/2012
171 20-06-2012 Corrigendum to Commercial Circular No. 149 dt. 04/11/2011. – Issue raised by M/s Torrent Power Ltd, M/s. SPANCO & M/s GTL on Commercial Circular No 149 regarding Additional Charges PR-3/Tariff/17155 Dt. 20/06/2012
170 13-06-2012 Grant of Open Access Permission for Fossil Fuel based Captive Power Plants (CPP) -EMBEDDED and NON EMBEDDED CPP’s-Procedure for Application, levy of Cross Subsidy Surcharge, Standby Charges& Additional Charge, Metering & Billing, etc. CE/Comm/CP/Open Access/ CPP/16411 Dt. 13/06/2012
169 13-06-2012 Grant of Open Access to Consumers sourcing power from Conventional Generator (Except for Non Conventional Energy Generator & captive Power Plants)- Procedurefor Application, levy of CrossSubsidy Surcharge,Standby Charges& Additional Charge, Metering & Billing, etc. CE/Comm/CP/Open Access/ General/16410 Dt. 13/06/2012
168 04-06-2012 Applicability of Tariff to Liquefied Petroleum Gas (LPG) Bottling Plant. PR-3/Tariff/15570 Dt. 04/06/2012
167 29-05-2012 Implementation of Pilot Scheme in respect of PWW consumers. P-Com/PWW Pilot/14913 Dt. 29/05/2012
166 22-05-2012 Methodology for calculation of interest in One Time Settlement package. P-Com/Recovery/14256 Dt. 22/05/2012
165 14-05-2012 Installation of Prepaid Meters at Government owned residence of employees (with transferable jobs) of various courts, State Government, Central Government, Local Bodies, etc; Procedure to be followed while installing the same. P-Com/Prepaid Meter/13434 Dt. 14/05/2012
164 20-04-2012 Tariff of Non-conventional Energy (NCE)/ Renewable Energy Projects for FY2012-13. CE/Comm/CP/NCE/Tariff/10212 Dt. 20/04/2012
163 19-04-2012 ““Abhay Yojana” Schemes for Recovery of arrears from: 1. Live & PD Public Water Works 2. PD Industrial Consumers 3. Live & PD Residential (BPL/Tribal/RGGVY Consumers) 4. Other Residential Consumers (Only PD) 5. PD Agricultural consumers “ PR-3/Abhay Yojana/10045 Dt. 19/04/2012
162 09-04-2012 सन २०११-१२ च्या खरीप हंगामातील ५० पैशापेक्षा कमी अंतिम पैसेवारी असलेल्या गावांना उपाययोजना व सवलती देणेबाबत. PR-3/Subsidy/9196 Dt. 09/04/2012
161 29-03-2012 Corrigendum to Commercial Circular No. 145 dated 29.09.2011. • Theft of electricity under Section 135 of Electricity Act, 2003 – Monetary Rewards to outsider informants/MSEDCL employees. PR-3/COS/8047 Dt. 29/03/2012
160 29-03-2012 Release of connections to the consumers after payment of proportionate amount of arrears and submission of undertaking for proportionate total arrears as per Commercial Circular No. 53. PR-3/COS/8047 Dt. 29/03/2012
159 23-02-2012 सन २०११-१२ मध्ये टंचाईग्रस्त परिस्तीथी जाहीर करण्यात आलेल्या गावातील कृषिग्राहकांना वीज बिलात सवलत देणेबाबत. PR-3/Jivan Sanjivani/4741 Dt. 23/02/2012
158 23-02-2012 ग्रामीण नळपाणी योजनांच्या थकीत वीज देयकांच्या अदायगीकासाठी केलेल्या “जीवन संजीवनी” योजनेला ३१ मार्च २०१२ पर्यंत मुदतवाढ PR-3/Jivan Sanjivani/4741 Dt. 23/02/2012
157 09-02-2012 Appellate Authority for the purpose of Section 127 of Electricity Act 2003. P-Com/Theft/3698 Dt. 09/02/2012
156 23-01-2012 Grant of Open Access Permission for Fossil Fuel based Captive Power PlantsGrant of Open Access Permission for Fossil Fuel based Captive Power Plants (CPP) – EMBEDDED and NON EMBEDDED CPP’s-Procedure for Application, levy of Cross Subsidy Surcharge, Standby Charges & Additional Charge, Metering & Billing, etc. CE/Comm/CP/Open Access/ CPP/2214
155 23-01-2012 Grant of Open Access to Consumers Sourcing power from Renewable energy generators (Such as Wind, Biomass, Bagasse, Solar, Small Hydro etc.) — Procedure for Application, levy of Cross Subsidy Surcharge, Standby Charges & Additional Charge, Metering & Bil CE/Comm/CP/Open Access/ RE/2213
154 23-01-2012 “Grant of open access to Consumers sourcing power from Conventional Generator (Except for Non Conventional Energy Generator & captive Power Plants)- Procedure for Application, levy of Cross Subsidy Surcharge, StandbyCharges & Additional Charge, Metering & Billing etc.” CE/Comm/CP/Open Access/ General/2212
153 03-01-2012 कृषी ग्राहकांकडील थकबाकी वसुलीकरता “कृषी संजीवनी योजना -२०११” ला ३१ मार्च २०१२ पर्यंत मुदतवाढ क्र. पी .आर -३/कृषी संजीवनी /२२७ Dt. 03/01/2012
152 29-12-2011 Corrigendum to Commercial Circular No. 151-Release of power supply to individual entrepreneurs commong under one premises through multi-partite agreement – Redelegation of powers PR-3/COS/38365 Dt. 29/12/2011
151 25-11-2011 Release of power supply to individual entrepreneurs commong under one premises through multi-partite agreement – Rdelegation of powers PR-3/COS/35111 Dt. 25.11.11
150 09-11-2011 Additional Charge to be levied to all consumer categories for _12_months w.e.f, 1st November 2011. REF.PR-3 / TARIFF/ 33484 DATE: 09.11.11
149 04-11-2011 Additional Charge to be levied to all cc nsumer categories for 12 months w.e.f. 1st November 2011. REF.PR-3 ! TARIFF! 33176 DATE: 04.11.11
147 30-09-2011 Grant of Open Access to Consumers Sourcing power from Renewable energy generators (Such as Wind, Biomass, Bagasse, Solar, Small Hydro etc.) — Procedure for Application, levy of Cross Subsidy Surcharge, Standby Charges & Additional Charge, Metering & Billing, etc. CE/Comm/CP/Open Access/RE/29753 Dt. 30/09/2011
146 30-09-2011 Grant of Open Access to Consumers sourcing power from Conventional Generator (Except for Non Conventional Energy Generator & captive Power Plants) – Procedure for Application, levy of Cross Subsidy Surcharge, Standby Charges & Additional Charge, Metering & Billing, etc. CE/Comm/CP/Open Access/General/29783 Dt. 30/09/2011
145 29-09-2011 Theft of electricity under Section 135 of Electricity Act, 2003 – Monetary Rewards to outsider informants/MSEDCL employees. P.Com/Theft Reward/29621 Dt. 29/09/2011
144 17-09-2011 Reference of the Legal Disputes u/s. 135 to Lok Adalat – Guidelines & Implementation. P.Com/lok Adalat/28174 Dt. 17/09/2011
143 16-09-2011 Directives for converting Single point supply consumers to Franchisee through MOU Route. PR-3/COS/27922 Dt. 16/09/2011
142 15-09-2011 Corrigendum to Commercial Circular No. 140 dt. 17/08/2011. PR-3/Tariff/27760 Dt. 15/09/2011
141 18-08-2011 Additional Energy Charges as per 12 months sales applicable w.e.f. 1st September 2011. PR-3/Tariff/25502 Dt. 18/08/2011
140 17-08-2011 Recovery of Additional Charges payable to MSPGCL(MAHAGENCO) in six equal monthly installments – Implementation of MERC Orders thereof. PR-3/Tariff/25450 Dt. 17/08/2011
139 05-08-2011 Delegation of power in respect of grant of Prompt Payment Discount. P-Com/Prompt Payment/24365 Dt. 05/08/2011
138 21-06-2011 Re-delegation of powers in respect of release of HT connections. Co-ord cell/Re-delegation of power/18961 Dt. 21/06/2011
137 16-06-2011 Tariff of Non-conventional Energy (NCE)/ Renewable Energy Projects for FY 2011-12.. CE/Comm/CP/NEC/Tariff/18440 Dt. 16/06/2011
136 13-06-2011 Issue of assessment bill under Section 126 & 135 as per Electricity Act 2003. P-Com/Theft/18065 Dt. 13/06/2011
135 13-05-2011 Re-delegation of powers in respect of load sanction. Co-ord cell/Re-delegation of power/15311 Dt. 13/05/2011
134 01-04-2011 कृषी ग्राहकांकडील थकबाकी वरील व्याजात सवलत देण्यासाठी “कृषी संजीवनी योजना -२०११” पी .आर -३/कृषी संजीवनी /१०८१० Dt. 01/04/2011
133 15-02-2011 Theft of Electricity – Assessment of Civil Liability & Compounding of Offence – Guidelines thereof PR-3/COS/5626 Dt. 15/02/2011
132 13-01-2011 Compounding of theft cases under Section 152, offence under Section 135 & lodging of FIR as per Electricity Act 2003. P-Com/Theft/01299 Dt. 13/01/2011
131 13-01-2011 Additional EnergyChargesapplicable w.e.f. 01/12/2010. PR-3/Tariff/01258 Dt. 13/01/2011
130 07-12-2010 राज्यातील कृषी ग्राहकांकडून इंधन व इतर समायोजन आकार माफ करणेबाबाबत पी .आर -३/कृषी/37046 Dt. 07/12/2010
129 01-12-2010 Schedule of Chareges- Recovery of processing fee thereof. PR3-COS/36124 Dt. 01/12/10
128 30-10-2010 Release of power supply at the voltage higher than stipulated in the MERC Supply of Power Regulation 2005. Co-ord cell/Higher Voltage/ No.33357 Dt. 30/10/10
127 30-10-2010 Administrative approval for filing legal suit against the defaulters for recovery of arrears. No. P-com/Legalj No.33352 Dt.30/10/10
126 30-10-2010 Delegation of powers for Chanqe of Name of consumers and the new Form “U” for effecting change of name. No.PR-3/ COS/ No.33350 Dt.30/10/10
125 21-10-2010 कृषीपंपधारक ग्राहकांना वीज बिलात इंधन समायोजन कर आकारणेबाबत. पी .आर -३/कृषी/32400 Dt.21/10/10
124 14-10-2010 Revision in Tariff – Implementation thereof PR-3/Tariff/31779 Dt. 14/10/2010
123 14-10-2010 Clubbing of common meters of Residential Housing Societies & Commercial Complexes. – Additional guidelines thereof. PR-3/Tariff/31671 Dt. 14/10/2010
122 12-10-2010 Tariff of Non-Convetional Energy (NCE) / Renewable Energy Projects for FY 2010-11. CE/Comm/NCE/Tariff/31371 Dt. 12/10/2010
121 29-09-2010 फिरत्या पथकाद्वारे विद्युत कायदा -२००३ मधील कलम १३५ व १२६ नुसार संबंधित ग्राहांकांविरुद्ध केलेल्या कारवाईच्या अनुशंघाने वीज देयके वितरित करणेबाबत . पी .आर -३/कॉस /२९४७० Dt. 29.09.2010
120 16-09-2010 Re-delegation of powers in respect of load sanction. Co-ord cell/Re-delegation of power/28964 Dt. 16/09/2010
119 21-07-2010 ग्रामीण नळपाणी योजनांच्या थकीत वीज देयकांच्या अदायगीकासाठी केलेल्या ” जीवन संजीवनी ” योजनेला मुदतवाढ पी .आर -३/जीवन संजीवनी /२३११३ Dt. 21/07/2010
118 18-06-2010 Checking of Zero, faulty & average billed consumers. PR-3/General /No/19345 Dt. 18/06/2010
117 15-06-2010 Clarificatory Order dt. 12/05/2010 in the matter of MERC’s ARR and Detail Tariff Order dt. 17/08/2009. PR-3/Tariff/18862 Dt. 15/06/2010
116 28-05-2005 Sanction & Release of power supply at the voltage higher than stipulated in the MERC Standard of Performance, Regulation, 2005. PR-3/Tariff/17146 Dt. 28/05/2005
115 18-05-2010 ग्रामीण नळपाणी योजनांच्या थकीत वीज देयकांच्या अदायगीकासाठी केलेल्या “जीवन संजीवनी” योजनेला मुदतवाढ पी .आर -३/जीवन संजीवनी /16080 Dt. 18/05/2010
114 17-04-2010 Release of power supply at the voltage higher than stipulated in the MERC Standard of Performance, Regulation, 2005. Ref. PR – 3 / Tariff/ Rs 11531 Date: 17/04/2010
113 16-04-2010 Applicability Of tariff with effect from 1ST April 2010. Ref. PR – 3 / Tariff / No 11314 Date: 16/04/2010
112 15-04-2010 Levy of Voltage Surchrge to consumers who are suppied power at lower voltage than precribed voltage as per per SOp regulations in case of HT Consumers. No. Co-ord Cell /Voltage Surcharge, Date: 15/04/2010
111 09-03-2010 महाराष्ट्र विद्युत नियामक अयोग विनिमय २००५ मधील भाग ८. ४ नुसार ग्राहक तपासणी लॉग बुक नोंदी अद्ययावत ठेवणेबाबत. पी .आर -३/कॉस /०७१८५ Dt. 09/03/2010
110 16-02-2010 Clubbing of common meters of Residential Housing Societies & Commercial Complexes. No. PR-3/Tariff/04778 Date: 16/02/2010
109 13-01-2010 राज्यातील मराठवाडा व विदर्भातील चंद्र्पुर व यवतमाळ जिल्हा व उर्वरित महाराष्ट्रातील टंचाईग्रस्त तालुक्यात टंचाईसदृश्य परिस्तिथी जाहीर करून उपाययोजना करण्याबाबत —– वीज सवलत देणेबाबत पी .आर -३/सबसिडी /१२६९ Dt. 13/01/2010
108 15-01-2010 Formation of “Damini Squad” at Circle Level for cross checking and control of meter reading activities of Agencies No. PR-3/Damini Squad/01648 Date: 15/01/2010
107 31-12-2009 Errata and Corrigendum Order dt. 21/12/2009 in the matter of MERC’s ARR and Detail Tariff Order dt. 17/08/2009. No. PR-3/Tariff/40060 Date: 31/12/2009
106 08-12-2009 Recovery of additional capacity charges payable to Ratnagiri Gas and Power Private Limited (RGPPL) – Implementation of MERC Order thereof. No. PR-3/Tariff/38174 Date: 08/12/2009
105 26-11-2009 Release of power supply at the voltage higher than stipulated in the MERC Standard of Performance, Regulation, 2005. No. PR-3/COS/36986 Date: 26/11/2009
104 21-11-2009 Rrocedure of Reduction in Contract Demand / Sanctioned Load in accordance with MERC (Electricity Code and other Conditions of Supply) Regualtions, 2005 – Delegation of powers thereof — Corrigendum No. PR-3/COS/36429 Date: 21/11/2009
103 19-01-2009 Guidelines for allotting the work of Photo Meter Reading and Bill Distribution to Mahila Bachat Gats / Mahila Mandals / Women Welfare Associations पी.कॉम /फोटो मीटर /३६२०३ Dt. 19/01/2009
102 13-11-2009 Transfer of Cost of Completed Work to Asset Account-need for expeditious action for preparation of Work Completion Report for clearance of Work In Progress Reference NO. Dir (Proj) MSEDCL / CAS / WIP /752 Date: 13/11/2009
101 16-10-2009 Procedure of Reduction in Contract Demand / Sanctioned Load in accordance with MERC (Electricity Supply and Other Conditions of Supply) Regulation, 2005 – Delegation of Powers thereof No. PR-3/COS/33445 Date: 16/10/2009
100 31-08-2009 ग्रामीण नळपाणी योजनांच्या थकीत वीज देयकांच्या अदायगीकासाठी केलेल्या “जीवन संजीवनी” योजनेबद्दल पी .आर -३/कृषी संजीवनी /२८८४३ Dt. 31/08/2009
99 29-08-2009 Assessment u/s and /or Offence u/s 135 of the Electricity Act, 2003 No. PR-3/COS/27533 Date: 29/08/2009
98 07-08-2009 Authorisation of Field Officers for One Time Settlement in case of LT Consumers and delegation of powers thereof No. P-Com/Accts/26321 Date: 07/08/2009
97 28-07-2009 Release of connections to the consumers who have purchased property during Court Auction and withdrawal of the condition No. 3 of Commercial Circular No. 53 dt. 07/05/2007. No. PR-3/COS/24859 Date: 28/07/2009
96 20-07-2009 ग्रामीण नळपाणी योजनांच्या थकीत वीज देयकांच्या अदायगीकासाठी आलेल्या “जीवन संजीवनी” योजना लागू करण्याबाबत . पी .आर -३/जीवन संजीवनी /२४१९० Date: 20/07/2009
95 19-07-2009 Recovery of Additional Security Deposit – Modification in Commercial Circular No.57 dt. 07/07/2007 in view of the decision of Ombudsman in representation No.23/2009 dt.26/03/2009 No. PR-3/COS/23833 Date: 19/07/2009
94 21-02-2009 यंत्रमाग ग्राहकांना दिनांक ०१ जानेवारी २००९ पासून लागू होणारे शासनाचे सवलतीचे दर- शुध्दीपत्र. पी .आर -३/यंत्रमाग /५७४२ Date: 21/02/2009
93 18-02-2009 यंत्रमाग ग्राहकांना दिनांक ०१ जानेवारी २००९ पासून लागू होणारे शासनाचे सवलतीचे दर पी .आर -३/यंत्रमाग /५३६२ Dt. 18/02/2009
92 07-02-2009 खरीप हंगाम २००८ मध्ये टंचाई परिस्तिथि जाहीर आलेल्या गावातील कृषी ग्राहकांना वीज बिलात देण्याबाबत. पी .आर -३/सबसिडी /४४०४ Dt. 07/02/2009
91 04-12-2008 DTC Metering and DTC Energy Audit – Modification of Billing System No. PR-3/COS/42646 Date: 04/12/2008
90 22-10-2008 Concession in the payment of Additional Security Deposit in respect of Powerloom Consumers and Agricultural consumers No. PR-3/COS/38788 Date: 22/10/2008
89 30-09-2008 वीज पुरवठा कायमस्वरूपी खंडित करण्यात आलेल्या घरगुती वीज ग्राहकांसाठी मुदतवाढ देणेबाबत. PR-3/Navprakash Yojana/36619 Dt. 30/09/2008
88 26-09-2008 Provisions of Clarificatory Order dated 12th September, 2008 in the matter of the detailed Tariff Order of MERC dated 20th June, 2008 PR-3/PR-3/Tariff /36292/ Date: 26/09/2008
87 30-08-2008 Extention to “Navprakash Yojana upto 30 September 2008 PR-3/Navprakash Yojana/33464 Date: 30/08/2008
86 25-07-2008 Theft cases under erstwhile E.A., 1910 – vis-à-vis Compounding of offences under Section 152 of E.A., 2003 PR-3/COS/29789 Date: 25/07/2008
85 25-07-2008 Recovery of Additional Security Deposit in 6 equal instalments in respect of Domestic Consumers PR-3/COS/SD/29788 Date: 25/07/2008
84 15-07-2008 सन २००८ च्या वर्षातील खरीप हंगामात राज्यात दि.१ जुलै २००८ ते आत्तापर्यंतच्या कालावधीत पडणाऱ्या सरासरी पावसाच्या तुलनेत कमी पाऊस झालेल्या ठिकाणी शेतकऱ्यांचा वीज पुरवठा थकीत बिलांच्या कारणात्सव खंडित न करणेबाबत. पी .आर -३/सबसिडी /२८५७७ Date: 15/07/2008
83 15-07-2008 Navprakash Yojana PR-3- Navprakash Yojana/ 28574 Date : 15/07/2008
82 09-07-2008 Subsidy in tariff to Government Lift Irrigation Scheme. PR-3/ Subsidy/27959 Date : 09/07/2008
81 07-07-2008 Revision in tariff – Implementation thereof. PR-3- Tariff/ 27692 Dated : 07/07/2008
80 31-05-2008 Revision in tariff (2008-09) – Implementation thereof. PR-3- Tariff/ 24556 Dated : 31/05/2008
79 30-05-2008 Exemption from payment of Security Deposit to the employees of MSETCL/MAHAGENCO for availing single phase residential / commercial connections. PR-3- Tariff/ 23180 Dated : 30/05/2008
78 28-03-2008 Consideration of power factor of 0.80 for computation of derived contract demand of LT consumers – guidelines thereof PR-3- Tariff/ 8864 Dated : 28/03/2008
77 01-03-2008 Subsidized rates to powerloom consumers w.e.f. 1 April 2007 No.PR-3/Powerloom/6134 Dated: 01/03/2008
76 30-01-2008 Compounding of offences under Section 152 of Electricity Act,2003 – Modified guidelines thereof. No.No. PR-3/COS/2814 Dated : 30.01.2008
75 29-01-2008 Appeal to the consumer for getting the meter tested while letting the premises on rental basis or purchasing the premises. No. PPR-3/COS /2705 Dated : 29/01/2008
74 16-01-2008 Provisions of Clarificatory Order dated 17th December 2007 in respect of the Clarificatory Order dated 11th September 2007 in the matter of the detailed Tariff Order of MERC dated 18th May, 2007 in Case No.65 of 2006. No.PR-3/Tariff /1508 Dated: 16/01/2008
73 13-12-2008 Recovery of Demand Charges (Fixed Charges) from Sate Government’s undertaking Irrigation colony.(Marathi) No. PR. 3 / Tariff / 43598 Dated: 13/12/2008
72 13-12-2007 Application of appropriate tariff to H.T. connections of Educational Institution, Hotels etc. No. PR. 3 / Tariff / 43598 Dated: 13/12/2007
71 12-12-2007 Categorization of HT I Consumers in Continuous and Non-continuous process – Corrigendum to Commercial Circular No.52 dt.07/05/2007. No.PR-3 / Tariff / 43385. Dated: 12/12/2007
70 05-10-2007 Delegation of powers to engage advocates for conducting theft of energy cases & other criminal cases before Special and other Courts & fees scheduled. Ref. No. PR-3/Tariff/37050 Dated:- 05/10/2007
69 12-11-2008 Subsidized rates to powerloom consumers w.e.f. 1 April 2007. No.PR-3/Powerloom/40575 Date: 12/11/2008
68 08-11-2007 Issue of Average / Supplementary / Amendment bills to the consumers – corrigendum to Commercial Circular No.65. No.PR-3/Tariff /40470 Date: 08/11/2007
67 01-11-2007 Issue of Average / Supplementary / Amendment bills to the consumers – corrigendum to Commercial Circular No.65. P.Com./Acctts/Supple bills/39630 Dated: 1/11/2007
66 19-10-2007 Categorization of HT I Consumers in Continuous and Non-continuous process – Corrigendum to Commercial Circular No.52 dt.07/05/2007. No.PR-3/Tariff/38471 Dated: 19/10/2007
65 20-10-2007 Issue of Average / Supplementary / Amendment bills to the consumers. P.Com./Acctts/Supple.bills/38675 Dated: 20/10/2007
64 24-09-2007 Recovery of Security Deposit from all the consumers including Government Departments, Municipalities, Local Authorities including Zilla Parishads and Licensees, etc. No. Pr-3/COS/35937 Dated: 24/09/2007
63 11-09-2007 Categorisation of HT I Consumers in Continuous and Non-continuous Process – Corrigendum to Commercial Circular No.52 Dated.07/05/2007 No. Pr-3/Tariff/35001 Dated: 11/09/2007
62 10-09-2007 Provisions of Clarificatory Order Dated 24th Aug 2007 in respect of the detailed Tariff / Order of MERC Dated 18th May, 2007 in Case No.65 of 2006 No. Pr-3/Tariff/34883 Dated: 10 Sept 2007
61 07-09-2007 सन २००६-२००७ च्या वर्षातील खरीप हंगामासाठी टंचाई जाहीर झालेल्या ठिकाणी कृषी ग्राहकांचा वीज पुरवठा खंडित न करणेबाबत. पी .आर -३/सबसिडी /३४६५५ Date: 07/09/2007
60 22-08-2007 Categorisation of HT I Consumers in Continuous and Non-continuous Process – Corrigendum to Commercial Circular No.52. No. Pr – 3 / Tariff / 33003 Dated: 22 Aug 2007
59 19-08-2007 कृषीपंपासाठी तात्पुरत्या वीज पुरवठ्याचे दर कमी होणेबाबत. पी .आर -३/कृषी /३२८३७ DATE: 19.08.2007
58 19-08-2007 Authorization of officers of the MSEDCL to disconnect supply line of electricity upon detection of theft of electricity – Section 135 (IA) of the Electricity Act 2003, amendments thereof. No. Pr-3/AG/32837 Dated: 19/08/2007
57 02-07-2007 Compounding of offences under Section 152 of Electricity Act, 2003. – Corrigendum to Commercial Circular No.49 Dated 21.12.2006 Pr-3/COS/28519 Dated: 12 July 2007
56 21-06-2007 Meter reading through Digital photography P-Com / ACCT / MRTDP / 26426 Dated . 21/6/2007
55 20-06-2007 Categorisation of HT I Consumers in Continuous and Non-continuous Process – Corrigendum to Commercial Circular No.52. Pr-3/Tariff//26203 Dated: 20/6/ 2007
54 14-06-2007 Revision in Tariff / – Implementation thereof Enclosure to Commercial Circular No.54 (Tariff / Booklet) Pr – 3 / Tariff//25485 Dated: 14/06/2007
53 07-05-2007 Release of connections to the consumers who have purchased Property during Court Auction. No. Pr-3 / Tariff / 21378 Dated: 07.05.2007
52 07-05-2007 Categorisation of HT I consumers in continuous and non-continuous. No. Pr-3 / Tariff / 21377 Dated: 07.05.2007
51 03-05-2007 Change in demand charges in respect of LT – V catagary. No. Pr-3 / Tariff / 20940 Dated : 03/05/2007
50 05-04-2007 Extending Bulk Discount Facility to Railway Traction Consumers No. Pr – 3 /Tariff / 17097
49 21-12-2006 Compounding of offences under Section 152 of Electricity Act, 2003 Pr-3/COS/45813 Dated :- 21-12- 2006
48 02-12-2006 Load factor incentive to H.T. Industrial consumers in case of exceeding The contract demand during the period 22.00 hrs. to 6.00 hrs. Pr-3/Tariff//43892 Dated :- 02/12/2006
47 04-11-2006 Revision in Tariff / – Implementation thereof. Pr – 3 / Tariff/ / 40506 Dated : 04.11.2006
46 16-10-2006 Authorization of employees of the MSEDCL to perform various functions under the Electricity Act 2003. Pr-3/COS /37722 Dated : 16/10/2006
45 09-10-2006 Revision in Tariff / – Implementation thereof. Pr – 3 / Tariff//36771 Dated :09/10/ 2006
44 07-10-2006 Corrigendum to Commercial Circular No.43 Dated 27-09-2006 Pr – 3 / COS / 36606 Dated : 07/10/2006
43 27-09-2006 Schedule of Charges REF.: Pr – 3 / COS /34587 Dated : 27/09/2006
42 19-08-2006 Concessional rate to Powerloom Consumer for the Year 2006 – 07. Pr-3/Subsidy / Powerloom 26938 Dated .19.08.2006.
41 17-08-2006 Amnesty Scheme – II for Permanently Disconnected Domestic and Comercial Consumers — Extention thereof Pr-3 / COS /24502 Dated .17.08.2006.
40 14-08-2006 Disconnection of Agriculture pumps. Pr-3/General/23857 Dated . 14.08.2006.
39 21-07-2006 Procedure to be followed for assessment and filing of theft case where Consumers meter is found abnormally slow. Pr-3 / COS / theft / 21266 Dated .21.07.2006.
38 19-07-2016 दुष्काळग्रस्त गावातील कृषी ग्राहकांचा वीज पुरवठा खंडित न करणेबाबत. पी .आर -३/जनरल /२०९५२ Dt. 19/07/2016
37 13-07-2006 Power of Police to investigate, search etc. under Electricity Act 2003 and Electricity Act 2005. Pr-3 / COS /20283 Dated .13.07.2006
36 03-07-2006 Compounding of offence under Section 152 of Electricity Act,2003 and receipt of payment. – Modification thereof. Pr-3 / COS /19460 Dated .03.07.2006.
35 03-06-2006 Amnesty Scheme – II Action Plan thereof. Pr-3 / COS /14510 Dated .03.06.2006
34 12-05-2006 Amnesty Scheme – II for Permanently Disconnected Domestic and Comercial Consumers. Pr-3 / COS /11905 Dated .12.05.2006.
33 03-04-2006 Theft of Energy and Compounding Charges. Pr-3 / COS /8110 Dated .03.04.2006.
32 28-03-2006 Clarification relating compounding of offence under Section 152 of the Electricity Act 2003 and receipt of payment thereof. Pr-3 / COS /7658 Dated .28.03.2006.
31 09-03-2006 Recovery of amount of theft of energy and compounding charges. Pr-3 / COS / 6073 Dated .09.03.2006.
30 01-03-2006 Delegation of powers in respect of load sanction for Motive power load Pr-3 / Gen/ 5257 Dated .01.03.2006.
29 17-02-2006 वीज ग्राहकांकरिता वीज देयके भरण्याची अंतिम मुदत निश्चिती व शासकीय कार्यालयांना वीज देयके भरण्यास मुदतवाढ देणेबाबत. पी .आर -३/कॉस /4263 DATE: 17.02.2006
28 08-02-2006 Theft of energy Electricity – Cash awards to outsider informants / MSEDCL’s employees. Pr-3 / COS / 3615 Dated . 08. 02.2006.
27 06-02-2006 Data retrieval of static Tri – Vector TOD meters installed to consumers. Pr-3 / General / 3342 Dated . 06.02.2006.
26 18-01-2006 Designating all the Court of Additional District and Session judges at the District Head Quarter for trial of cases under the Electricity Act.2003. Pr-3 / COS / 1469 Dated . 18.01.2006
25 13-01-2006 Provisions pertaining to Power Factor Penalty and Power Factor Incentive. Pr-3 / COS / 1226 Dated . 13 01. 2006
24 06-01-2006 Procedure to be followed while assessing the consumer (under electricity act 2003) for unauthorised use of electricity. Pr-3 / COS / 0482 Dated .06.01.2006.
23 06-01-2006 Amnesty Scheme for Permanently Disconnected Low Tension Consumers. —- Extention thereof. Pr-3 / COS / 0521 Dated .06.01.2006.
22 03-01-2006 Providing of Cheque Boxes at all the Section Office and Sub-Division Office. Pr-3 / General / 00212 Dated .03. 01.2006.
21 06-12-2005 कृषी ग्राहकांना तात्पुरत्या स्वरूपाचा विद्युत पुरवठा कारणेबाबाबत. पी .आर -३/कृषी /३७७८४ Dt. 06/12/2005
20 06-12-2005 Commercial Utilisation for display of advertisement by fixing Kiosks on HT / LT poles, Sub-Station structures, fencing etc. Pr-3 / General / 37483 Dated . 06.12.2005.1
19 21-11-2005 Release of Power supply on Priority basis to Agricultural consumers -‘ KRISHI – VIKAS – III SCHEME’ Pr-3 / AG / 35758 Dated . 21.11.2005.
18 09-11-2005 Re – delegation of Power to initiate legal action for recovery of arrears of energy bill. Pr-3 / COS / 35004 Dated . 09.11.2005.
17 18-10-2005 Theft of energy Electricity – Assessment of Civil Liability and Compounding of offence – Guidelines therefore. Pr-3 / COS / 33598 Dated . 18.10.2005.
16 17-10-2005 Sanction and release of power supply on Low Tension for load more than 67 / 100 HP. Pr-3 / COS / 33472 Dated . 17.10.2005
15 10-10-2005 Re – delegation of powers in respect of load sanctioned for Industrialpurpose. P.Com / Co.Ord.Cell / 32836 Dated . 10.10.2005.
14 07-10-2005 Implementation of Spot Billing and instructions regarding stopping of average bills. Pr-3 / General / 32682 Dated . 07.10.2005.
13 29-09-2005 Amnesty Scheme for Permanently Disconnected L.T. Consumers. Pr-3 / COS / 31374 Dated . 29.09.2005.
12 29-09-2005 Sub delegation of power to the Zonal Recovery Committee for recovery of arrears of HT Consumers. P.Com / Acctt. / 31316 Dated . 29.09.2005.
11 27-09-2005 Subsidy in Tariff / to High Tension Powerloom consumers for the periodYear 2005-06. Pr-3 / Subsidy / 31090 Dated . 27.09.2005.
10 23-09-2005 Concessional Tariff / for Temporary connection to SarvajanikGaneshotsav Mandals during Ganpati Festival. Pr-3 / Tariff/ / 30727 Dated . 23.09.2005.
9 21-09-2005 Installation of LTMD meters to LT comsumers of industrial and Commercial category having load of 20 KW and above. Pr-3 / Tariff/ / 30457 Dated . 21.09.2005.
8 16-09-2005 Corrigendum to Deptt.Cir.(Comm.) No.722 Dated.17.11.04 Determinationof “Load Factor” in Respect of Hight Tension Consumers. Pr-3 / Tariff/ / 30079 Dated .16.09.2005.
7 15-09-2005 Deferment / Instalments / Relief to consumers affected by heavy rains and floods. Pr-3 / General / 28805 Dated . 15.09.2005.
6 01-09-2005 Power supply to individual enter Preurs coming under one Premise to establish Powerloom. Pr-3 / COS / 28357 Dated . 01.0 9.2005.
5 26-08-2005 Excess Connected Load and Penalty thereof – L.T. Tariff / Booklet. Pr-3 / Tariff/ / 27729 Dated . 26.08.2005.
4 26-07-2005 Unauthorised connection / reconnection with electric lines of the Distribution Licenses – Action under Section 138 of the Elect. Act.2003. Pr-3 / COS / 24976 Dated . 26.07.2005.
3 01-07-2005 Issue of monthly bill in Urban Areas from August – 2005. P-Com / Acctts. / Monthly Bills / 21882 Dated . 01.07.2005.
2 01-07-2005 Assessment of civil liability in the matter of theft of electricity Revised guidelines. Pr-3 / COS / 21907 Dated . 01.07.2005
1 01-07-2005 Lodging of complaint of theft of electricity with the local Police Station Pr-3 / COS / 21906 Dated . 01.07.2005.

Urja
Empowering the Consumer