Case No. &Date | Description of matter | Complainant | Order Date | Veiw/Downloads |
---|---|---|---|---|
1 2017 |
In the matter of getting SOP compensation for failure to meet standards of performance regarding refund of security deposit. | Dr. Shri.Amod Laxman Rairikar, 209/2, New (Sadashivpeth) Shastri Road, Bharat Petrol Pump, Pune-411030. | 20/02/2017 | Download now |
2 2017 |
In the matter of refund of security deposit alongwith SOP Compensation. | M/s.Indus Towers Limited, 2010, E-core, 2nd floor, Marvel Edge, Vimannagar, Pune-411014. | 20/02/2017 | Download now |
6 2017 |
In the matter of change of name. | Parveen M.Shaikh, Flat No.13, Bldg.A/6, Bramha Angan, Salunke Vihas Road, Kondwa, Pune- 411048 | 18/02/2017 | Download now |
3 2017 |
In the matter of change of name. | Reshma Saraf, Shop No.07, Millennium Star Building, Dhole Patil Road, Pune-411001 | 02/03/2017 | Download now |
7 2017 |
In the matter of recovery of arrears in the event of defective meter | M/s.Kailash Parbat Hotel (I) Ltd., Plot No.4, Walwan Lonawala, Tal.Maval, Dist.Pune | 03/03/2017 | Download now |
9 2017 |
In the matter of exorbitant billing. | Mr.Santosh Baban Amrute, Ramkrishnahari Ashram, Alandi, Tal.Khed, Dist.- Pune | 10/03/2017 | Download now |
11 2017 |
In the matter of assessment of energy bill in case of bypassing of metering kiosk due to faulty PT, when check meter is OK & in the good healthy working condition. | M/s.Sufi Strucutural Conductors | 16/03/2017 | Download now |
4 10.01.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
5 10.01.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
15 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
16 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
17 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
18 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
19 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
20 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
21 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
22 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
23 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
24 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
25 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
26 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
27 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
28 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
29 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
30 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
31 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
32 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
33 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
34 01.03.2017 |
M/s.Indus Towers Ltd. |
In the matter of refund of security deposit alongwith SOP Compensation. |
09.03.2017 | Download now |
35 01.03.2017 |
M/s.Indus Towers Ltd. | In the matter of refund of security deposit alongwith SOP Compensation. | 09.03.2017 | Download now |
10 01.02.2017 |
M/s. Akshay Insulated Conductors, 752/A-1, Khed Shivapur, Tal. Haveli, Dist.Pune- 412205 | In the matter of recovery of differentiation amount due to wrong application of tariff category. | 31.03.2017 | Download now |
12 10.02.2017 |
M/s. Akshay Insulated Conductors, 752/A-1, Khed Shivapur, Tal. Haveli, Dist.Pune- 412205 | Secretary, Sainandan Sah.Griha Sanstha Maryadit, S.No.15/2/3/8, Hingane Khurd, Pune- 411051 | 06.04.2017 | Download now |
8 16.01.2017 |
M/s.GreenScape Reality LLP, S.No.117/2,Kune, Tal.Maval, Dist.Pune | In the matter of wrongly sanctioning of technical estimate for giving power supply to residential bunglows under DDF scheme by paying 1.3% Supervision charges on the normative charges of the estimate & SOP compensation for delay. | 16.03.2017 | Download now |
37 05.04.2017 |
Mr.Mahesh Balkrishna Dedge | In the matter of restoration of supply & change of name. | 17.04.2017 | Download now |
13 13.02.2017 |
Mr.Bharat Gulab Wadekar, At Post- Bahul, Tal.Khed, Dist.- Pune, Pin-410501 | In the matter of restoration of supply & change of name. | 12.04.2017 | Download now |
14 27.02.2017 |
M/s.Indus Towers Limited, 2010, E-core, 2nd floor, Marvel Edge, Vimannagar, Pune-411014 | In the matter of wrong/excess billing. | 26.04.2017 | Download now |
36 18.03.2017 |
Mr. Eknath Gabaji Dongre | In the matter of refund of Security Deposit alongwith penalty, interest & compensation. | 16.05.2017 | Download now |
38 13.04.2017 |
Mr.Kisan V.Navalkar | In the matter of exorbitant billing. | 15.05.2017 | Download now |
40 09.05.2017 |
M/s.SanseraEngineering (Pvt.)Ltd., Pune-01. | In the matter of instalment of ABT Meter. | 16.05.2017 | Download now |
39 25.04.2017 |
Sant Gorobakaka Aani Vithalmandir | In the matter of exorbitant billing. | 09.06.2017 | Download now |
47 17.06.2017 |
Mrs.Jayshree B.Thorwe | In the matter of exorbitant billing.. | 23.06.2017 | Download now |
43 29.05.2017 |
Shri.Madhukar Narayan Kawade | In the matter of issuance of revised bills as per meter reading & refund of meter cost with interest. | 30.06.2017 | Download now |
44 30.05.2017 |
Shri.V.K.Dhoka | In the matter of recovery of arrears of P.D. consumer against the present consumer. | 30.06.2017 | Download now |
41 22.05.2017 |
Mr.Sunil C Medankar | In the matter of exorbitant billing. | 21.07.2017 | Download now |
42 22.05.2017 |
Mr.Pushapak V Doshi | In the matter of refund of P.F. penalty charged in the energy bills. | 18.07.2017 | Download now |
46 09.06.2017 |
M/s.Sarda Oil Mill, Gat No.756/A, Lonikalbhor, Tal.Haveli, Dist.- Pune-412201 | In the matter of exorbitant billing. | 02.08.2017 | Download now |
45 06.06.2017 |
M/s.Idea Cellular Ltd., Plot No.7, PH-I, MIDC, Hotel Tammana Bldg., Hinjewadi, Pune-27 | In the matter of exorbitant billing & refund of excess bill amount. | 05.08.2017 | Download now |
49 11.07.2017 |
Mr.Azizul Hoque, 27 M.G.Road, Pune- 411001 | In the matter of recovery of arrears of P.D.consumer from the present consumer. | 28.08.2017 | Download now |
50 11.07.2017 |
Mr.Azizul Hoque, 27 M.G.Road, Pune- 411001 | In the matter of recovery of arrears of P.D.consumer from the present consumer. | 28.08.2017 | Download now |
48 05.07.2017 |
Mrs.Anita Uday Laturkar, S.No.33, Dattanagar, Youvaraj Colony, Warje, Pune – 411058 | In the matter of disconnection of supply | 04.09.2017 | Download now |
51 11.07.2017 |
M/s. Sharada Construction & Investment Co. , 685/2-C, Satararoad , Near Bajaj Auto Showroom, Ashwamedh, Pune- 411037 | In the matter of recovery of electricity duty (ED) difference between Commercial & Industrial rate for the period Nov.2010 to Dec.2016. | 12.09.2017 | Download now |
52 19.07.2017 |
Shri. Narayan Dattu Bhosale, C/o, “Savali� Near Watertank, At-Warulwadi, Post- Narayangaon, Tal.-Junnar, Dist.Pune-410504. | In the matter of exorbitant billing. | 19.09.2017 | Download now |
53 24.07.2017 |
Shri. Devidas Ramdas Kale, At Post-Kalewadi/Darekarwadi,Ghodegaon, Tal.Ambegaon,Dist.-Pune- 412408. | In the matter of shifting of overhead lines. | 22.09.2017 | Download now |
54 01.08.2017 |
Mrs. Laxmi V. Zagade, S.No.38, Kharadkarnagar, Pote Bldg., Ghar No.390, Wadgaonsheri, Pune –411014 | In the matter of illegal recovery of LED bulbs amount. | 22.09.2017 | Download now |
57 03.10.17 |
Shri.Sandeep V.Hole, S.No.176/4, Harekrishana Bldg., 2nd Floor,Flat No.202, Hind Colony, dhamalwadi, Pune.4 | In the matter of disconnection of supply. | 07.10.2017 | Download now |
58 03.10.2017 |
Mrs.Pallavi S.Hole, S.No.176/4, Harekrishana Bldg., 2nd Floor,Flat No.202, Hind Colony, dhamalwadi, Pune. | In the matter of disconnection of supply | 10.10.2017 | Download now |
55 04.09.17 |
M/s. P.N.Gadgil & Co., | In the matter of recovery of arrears in the event of defective meter. | 25.10.17 | Download now |
59 16.10.17 |
Sameerkumar S. Bagade | 25.10.17 | Download now | |
56 28.09.17 |
The Chairman, Kamal Green Leaf, Kirkatwadi, Pune. | In the matter of recovery of arrears in case of defective meter. | 10.11.17 | Download now |
61 16.10.2017 |
Mr.Kishor B. Dhotre,53/418, Laxminagar,Parvati,Pune- 411009 | In the matter of exorbitant billing & getting SOP compensation | 06.12.17 | Download now |
60 23.11.2017 |
M/s.Dharmavat Stone Crusher, Prop.Shirish Dharmavat, S.No.14/1/3, Yewalewadi, Haveli, Pune-411048. | In the matter of recovery of tariff difference bill amount due to clubbing of two connections in to a single one. | 03.01.18 | Download now |
62 06.11.2017 |
Shri. Prakash Shivaji Thakkar | In the matter of shifting of meter and new connection. | 04.01.18 | Download now |
63 24.11.2017 |
M/s. Dharmavat Stone Crusher, Prop.Shirish Dharmavat, S.No.14/1/3, Yewalewadi, Pune – 411048. | In the matter of load reduction | 03.01.18 | Download now |
65 02.12.2017 |
Shri.Bharat Gulab Wadekar, At Post- Bahul, Tal.-khed, Dist.-Pune. | In the matter of shifting of meter and new connection. | 16.01.18 | Download now |
67 13.12.2017 |
Shri.Dhairyasheel Vivek Shinde, PlotNo.149,S.No.14/2,3,4&16/1,2, Shindenagar, Bavdhan Kh, Pune – 411021 | In the matter of defective meter and excess bill. | 16.01.18 | Download now |
64 28.11.2017 |
Nea Co-Op.Hsg. Socy.Ltd., S.No.41/ 2/3 to 13 and 15, Sus, Tal.Mulshi, Pune -411021. | In the matter of refund of excess bill and SOP compensation. | 29.01.18 | Download now |
66 05.12.2017 |
Nea Co-Op.Hsg. Socy.Ltd., S.No.41/ 2/3 to 13 and 15, Sus, Tal.Mulshi, Pune -411021. | In the matter of interruption in power supply & SOP compensation. | 29.01.18 | Download now |