CGRF Bhandup Urban Zone 2004-2008

Case No. & Date Description of matter Complainant Order issued Date View / Downloads
1 In the matter billing complaint Aditi Apartment Owners Association, Vashi
Navi Mumabi
18/12/04 Download now
2
26/10/04
In the matter of billing complaint and theft of meter Shri Narendra R. Ghosh,
Thane
10/12/04 Download now
3
15/10/04
Complainant has failed to give relevant information, the case is therefore closed. Dr. Bhalchandra Lab
Bhandup
11/01/.05 Download now
4
30/10/04
In the matter of electric connection Smt. Divender Kaur Saini
Mulund
27/12/04 Download now
5
30/10/04
Shri V.S. Bhave
Thane
10/12/04
6
02/11/04
In the matter of electric supply Shri Dwarka K. Jogeshwar
Bhandup
18/12/04 Download now
7
07/11/04
In the matter of deposit Shri P.V. Bhide
Thane
18/12/04 Download now
8
09/11/04
In the matter of new connection Shri Uday N. Soparkar
Thane
27/12/04 Download now
9
10/11/04
Incomplete papers Shri M.L. Bhilange
Bhandup
Withdraw
10
11/11/04
In the matter of bill revision M/s. Kukreja Complex
Bhandup
22/03/05 Download now
11
11/11/04
In the matter of demand charges charged was in excess Shri Narayan D. Thakkar
Bhiwandi
11/01/05 Download now
12
16/11/04
Shri Suresh Nerurkar
Kalwa
Forwarded to ICGRC Download now
13
20/11/04
Incomplete papers Shri Ashok K. Masare
Thane
22/02/05
14
24/11/04
M/s. Intel Construction Withdraw
15
02/12/04
Incomplete papers Shri Nandkishor S. Sawant
Bhandup
17/12/05
16
09/12/04
In the matter of refund of DPC payment, which is charged wrongly, should be waived M/s. Sphere Engineers Pvt. Ltd.
Wagle Estate
07/03/05 Download now
17
10/12/04
In the matter Record of security deposit paid earlier by previous owner & record is not available with MSEB M/s. Indian Leather Handicraft
Wagle Estate
04/05/05 Download now
18
17/12/04
In the matter of electric supply Mrs. Vibhavari Sawant
Bhandup
04/03/05 Download now
19
17/12/04
M/s. Devdarshan Phase II
Thane
Forwarded to ICGRC
20
22/12/04
Mrs. Fatma Dayd Murchant
Mumbra
Forwarded to ICGRC
21
17/01/05
In the matter of billing complaint M/s. Bombay Protins 23/03/05
22
19/01/05
Shri P.B. Radhakrishanan
Mulund
Forwarded to ICGRC
23
20/01/05
In the matter of billing complaint Smt. Shobha Ashwin Treasurer
Thane
13/05/05 Download now
24
04/03/05
In the matter of billing complaint Shri Suresh Anant Nerurkar
Thane
08/04/05
25
04/03/05
In the matter of average billing M/s. Devendra Machinery & Fabricators
Bhandup
08/06/05 Download now
26
04/03/05
Consumers advocate has submitted the application to keep the grievance abated, case is disposed off due to M/s. Steel Chain Conveyors Pvt. Ltd.
Bhandup
08/06/05 Download now
27
07/03/05
Consumer had also approached to ICGRC & pending with it, hence not considered M/s. Anandi Seva Kendra
Nerul
28
07/03/05
In the matter of illegal recovery M/s. Royal Plastics
Koparkhairne
12/05/05 Download now
29
24/03/05
In the matter of excess billing M/s. Devdarshan Phase II
Thane
12/05/05 Download now
30
30/03/05
In the matter of illegal disconnection Shri Pravin M. Chpda
Mulund
30/03/05 Download now
31
30/03/05
In the matter of illegal disconnection Shri M.N. Chopda
Mulund
30/03/05 Download now
32
30/03/05
In the matter of excess billing Shri Surendra N. Nair
Mulund
12/05/05
33
26/04/05
In the matter of billing complaint Shri P.B. Radhakarishna
Mulund
26/02/08 Download now
34
26/04/05
In the matter of billing complaint & reconnection Shri Veerji B. Gohel
Thane
08/06/05 Download now
35
26/04/05
In the matter of billing complaint M/s. Habibul Enterprises
Bhandup
08/06/05 Download now
36
06/05/05
In the matter of billing complaint M/s. Rajesh P. Mange,
Bhiwandi
28/06/05 Download now
37
09/05/05
In the matter of billing complaint Shri H.I. Shirsale
Thane
28/06/05 Download now
38
24/05/05
In the matter of wanted concession in Meter cost, Security Deposit, S.L.C. charges M/s. Anandi Seva Kendra
Nerul
17/06/05 Download now
39
24/05/05
In the matter of meter cost recovered twice, SLC charged while connection shifting Shri Gurumal Sohanlal
Bhiwandi
21/07/05 Download now
40
24/05/05
In the matter of meter cost recovered twice, SLC charged while connection shifting Shri Dharamdas G. Talreja
Bhiwandi
21/07/05 Download now
41
01/06/05
In the matter new connection not sanctioned M/s. Pooja Textile
Bhiwandi
28/06/05 Download now
42
02/06/05
In the matter of new connection M/s. Vikas Textile
Bhiwandi
28/06/05 Download now
43
02/06/05
In the matter of additional load M/s. Dreams Textile
Bhiwandi
28/06/05 Download now
44
02/06/05
In the matter of additional load M/s. Imfa Textile
Bhiwandi
28/06/05 Download now
45
04/06/05
In the matter of new connection M/s. Rajsheela Trading P.Ltd.,
Thane
06/07/05 Download now
46
08/06/05
In the matter of additional load Mrs. Renu Manoj Sharma
Bhiwandi
28/06/05 Download now
47
08/06/05
In the matter of additional load Smt. Savita R. Sharma
Bhiwandi
28/06/05 Download now
48
07/07/05
In the matter of illegal disconnection, repeated harassment & high corruption Smt. Kavita Kishor Mehta
Bhiwandi
30/08/05 Download now
49
08/07/05
In the matter of non adjustment of S.D. against current energy bill M/s. Kala Silk Mills Pvt. Ltd.
Bhiwandi
30/08/05 Download now
50
25/07/05
Shri Arvin Ahuja
Kharghar
Forwarded to ICGRC
51
26/07/05
M/s. R.T. Textile
Bhiwandi
30/08/05 Download now
52
01/10/05
S.L.C. amount charged was in excess M/s. Kishor Stone,
S.No. 163, TTC, MIDC, Pawane
11/05/06 Download now
53
30/12/05
MD resetting knob was found defective M/s. Hiravati International Pvt. Ltd.,
Vashi.
11/05/06 Download now
54
10/01/06
Load shedding Dr. Satyanand R. Khade,
Bhiwandi
12/05/06 Download now
55
31/01/06
Consumers in Bhiwandi should be charged at the rate 150 unit/HP/month under status ‘1’ instead of status ‘0’ M/s. Maharashtra Electricity Consumer Association,
Bhiwandi.
12/05/06 Download now
56
31/01/06
Charged on basis of average unit as meter was not available at site Shri Kamalesh M. Jain
Bhiwandi.
12/05/06 Download now
57
31/01/06
Charged on basis of average unit as meter was not available at site Shri Mithalal M. Jain
Bhiwandi.
12/05/06 Download now
58
01/02/06
Non receipt of electricity bill Shri Chandrakant R. Khandelwal
Powai
12/05/08 Download now
59
28/03/06
Excess billing Shri Rampratap Ramavatar Yadav
Kalwa Road.
02/06/06 Download now
60
07/04/06
Excess penalty Shri Rajesh P. Mange,
Bhiwandi
16/05/06 Download now
61
17/04/06
In the matter of abnormal bill Sau. Razia Esrar Shaikh
Nerul
07/06/06
62
19/04/06
Excess penalty charged & excess security deposit M/s. Ashish Engg. Works
Thane
20/05/06
63
19/04/06
Disconnection of electric supply M/s. Sonal Builders
Thane
17/07/06
64
06/05/06
In the matter of Excess billing Sau. Bharati D. Kharat
Mulund (E)
07/06/06
65
11/05/06
    Reconnection of supply Shri Manohar Shankar Rane,
Bhandup (W).
21/06/06
66
15/05/06
In the matter of Excess billing Shri Bapu Shankar Chavan
Thane
24/07/06
67
17/05/06
In the matter of U.G. system feeding supply is old and deterioted and causing large numbers of interruptions M/s. Idrish Enterprises
Bhandup (W)
07/06/06
68
25/05/06
Even after removal of meter and service cable consumer was issued energy bills M/s. Sundaram Textiles,
Bhiwandi
15/07/06
69
25/05/06
In the matter of Excess billing M/s. R.M.K. Special Cables
Mahim
17/07/06
70
31/05/06
In the matter of billing complaint M/s. Aditi Apartment Owner’s Association,
Navi Mumbai
24/07/06
71
05/06/06
In the matter of billing complaint Shri Hari K.. Mathur
Belapur
17/07/06
72
06/06/06
In the matter of billing complaint Shri Kirtee Sanghavi
Bhiwandi
15/07/06
73
19/06/06
In the matter of billing complaint Smt. Meena M. Ahuja
Bhiwandi
27/07/06
74
29/06/06
In the matter of billing complaint M/s. Dala Engineering Works
Thane
24/07/06
75
27/06/06
In the matter of arrears M/s. Ravi Electricals
Wagle Estate,
01/08/06
76
07/07/06
In the matter billing dispute Shri Rehman Salim Khan
Bhiwandi
21/09/06
77
07/07/06
In the matter of wrong billing, unlawful disconnection without serving any notice Mrs. Aparna U. Kotwal
Airoli
24/08/06
78
20/07/06
In the matter of disconnection of supply Shri Bhavesh D. Nagda
Bhandup (E)
28/08/06
79
20/07/06
In the matter of assessment for slow meter Shri Mahesh S. Mulchandani
Bhiwandi
24/08/06
80
20/07/06
In the matter of assessment for slow meter Shri Haresh K. Dasuja
Bhiwandi
24/08/06
81
24/07/06
In the matter billing dispute M/s. S.T. of Shri P.D. Thakkar
Bhiwandi
21/09/06 Download now
82
27/07/06
In the matter of theft of energy Smt. Girja Malpani
Bhiwandi
24/08/06
83
02/08/06
In the matter of theft case M/s. Chheda Brothers
Bhandup (W)
03/11/.06
84
08/08/06
In the matter billing dispute M/s. Leo Circuit Boards P.Ltd.
Vashi
23/08/06
85
09/08/06
In the matter of billing dispute Shri. Santosh Nadkarni
Thane
11/09/06
86
25/08/06
In the matter of billing dispute Shri Kishor G. Kulthe
Igatpuri
22/09/06
87
02/09/06
In the matter of wrong reading Shri S.H. Jain
Bhiwandi
03/11/06 Download now
88
13/09/06
In the matter of billing dispute Dr. Satyanand R. Khade,
Bhiwandi
27/10/06
89
06/10/06
In the matter of recovery of under bellied unit due to faulty meter Shri Hiranand T. Jeshwani
Bhiwandi
21/11/06
90
06/10/06
In the matter of assessment Smt. Kavita A. Ahuja
Bhiwandi
21/11/06
91
06/10/06
In the matter of raising supplementary bill against the less recorded consumption due to irregularities Shri Mohandas D. Ahuja
Bhiwandi
21/11/06
92
09/10/06
In the matter of raising supplementary bill against the less recorded consumption due to irregularities Shri Ashok M. Ahuja
Shop No. 2, Kalyan Road, Zenieth Comp., Bhiwandi
21/11/06
93
09/10/06
In the matter of providing concession of HT billing as affected by flood on date 26/07/05 M/s. Kala Silk Mills Pvt. Ltd.
Bhiwandi
21/11/06
94
10/10/06
In the matter of wrong application of MF and recovery of under billed unit M/s. Everest Paper & Plastic Industries
Wagle Ind. Estate
16/11/06
95
18/10/06
In the matter of availability of bulk discount to consumers billed as per HTP-III tariff Shri Nandkumar M. Patil
Ex.Engr. (M&F),  Bhiwandi.
16/11/06
96
18/10/06
In the matter of wrong billing (not as per meter reading) Altaf M.H. Bhopali
Bhiwandi
30/11/06
97
18/10/06
Interim order Shri Ashwin V. Treasurer
Thane
31/10/06
98
19/10/06
In the matter of replacement of failed DTC & compensation towards loss of production drive to delay in replacement of it Shri Mohd. Yunus M. Ali
Bhiwandi
30/12/06
99
13/11/06
In the matter of theft of electricity Shri Jagjitsingh R. Yadav
Thane
30/12/06
100
16/11/06
In the matter of refund of energy bill paid before occupancy of the appellant Shri S.R. Sakhalkar
Mulund (W)
30/12/06
101
22/11/06
In the matter of refund of supervision charges collected in excess Smt. Dayaben R. Thakkar
Bhiwandi
30/12/06
102
28/11/06
In the matter of release of new connection on private transformer commissioned M/s. Palak Textiles
Bhiwandi
30/12/06
103
05/12/06
In the matter of illegal disconnection of electric supply and other disputes Shri Ashwin V. Treasurer
Thane
31/07/07 Download now
104
14/12/06
In the matte of supervision charges collected worngly Shri Imtiyaz A.G. Momin
Bhiwandi
11/01/07
105
14/12/06
In the matter of non issue of bill as per the meter reading and non compliance of ICGRC order Shri Sudhir J. Thakkar
Bhiwandi
11/01/07
106
14/12/06
In the matter of extending benefit of power loom sanjeevani yojna Shri Parasmal Sogaja
Bhiwandi
11/01/07
107
28/12/06
In the matter of wrong MF applied M/s. Green World Magnum Enteprises
Mulund (W)
18/01/07
10822/01/07 In the matter of giving Additional Power load M/s. Whistling Woods International Ltd.,
Bandra
20/06/07 Download now
10907/02/07 In the matter of bill amount adjustment

M/s. Kohinoor
Fabrics Pvt. Ltd.,
Bldg. No. 132
Bhiwandi.

15/05/07 Download now
11015/02/07 In the matter of non supply of electric connection in the residential premises

Shri Sanjay Madhusudan Saturdekar,
Thane

10/04/07 Download now
11120/02/07 In the matter of given power bills wrongly, disproportionate to electricity use

Shri Madhukar G. Patil
Bhiwandi

30/04/07 Download now
11213/03/07 In the matter of incorrect billing of Industrial consumer

M/s. Shah Plastics.
Kanjur

10/04/07 Download now
11313/03/07 In the matter of wrong recovery, sanction of additional load and continued billing even after permanent disconnection

Shri Asad Ibrahim Khan
Bhiwandi

15/05/07 Download now
11413/03/07 In the matter of wrong recovery, sanction of additional load and continued billing even after permanent disconnection

Smt. Khalida Asad Khan
Bhiwandi

15/05/07 Download now
11514/03/07 In the matter of delay in replacement of failed transformer causing production loss and request for enhancing power load

M/s. R.T. Textile
Shop No. 2, Bhiwandi

10/05/07 Download now
11613/03/07 In the matter of wrong MF

Shri Gajanan R. Naik
Bhiwandi

27/04/07 Download now
11702/04/07 In the matter of non payment of electricity dues

M/s. Growell Mercantile P. Ltd.,
Taloja

30/04/07 Download now
11828/03/07 In the matter of disconnection of electric supply

M/s. Bombay Metal Fabrics
Mulund.

30/04/07 Download now
119
11/04/07
In the matter of delay in replacement of failed D.T.C. causing production loss and request for the compensation

M/s. Pooja Textiles
Bhiwandi

31/05/07 Download now
12010/04/07 In the matter of change of name Shri Manoj Dattatraya
Randive
Mulund
31/07/07 Download now
121
18/04/07
In the matter of failed DTC and compensation towards loss of production due to delay in replacement of it Smt. Jaya Mohandas
Bhiwandi
31/05/07 Download now
122
05/05/07
In the matter all formalities are completed but connection was not released Shri H.R. Sharma
Thane
31/07/07 Download now
12315/05/07 In the matter of billing complaint Shri Dayalal Chaganlal Rathod
Bhandup.
31/07/07 Download now
12418/05/07 In the matter of wrong recovery of over load and capacitor penalty Smt. Renu Manoj Sharma,
Bhiwandi
29/06/07 Download now
12518/05/07 In the matter of wrong recovery of over load and capacitor penalty Smt. Savita Rajesh Sharma
Bhiwandi
29/06/07 Download now
12628/05/07 In the matter of payment of interest on S.D., refund of S.D., P.D. of HT connection & compensation for non- disconnection, procedure for P.D M/s. Chamunda
Textile Mills
Bhiwandi
31/07/07 Download now
12707/06/07 In the matter of non sanction of new connection and compensation for delay M/s. Imfa Agro Pvt. Ltd.
Bhiwandi.
04/08/07 Download now
12807/06/07 In the matter of wrong billing Shree Sheetal Twisting & winding
Bhiwandi.
31/07/07 Download now
12907/06/07 In the matter of bill revision Shri Pratap H. Thakkar
Bhiwandi
04/08/07 Download now
13015/06/07 In the matter of bill revision Mahesh Kumar K. Agarwal
Bhiwandi
27/09/07 Download now
131
20/06/07
In the matter of releasing new connection against arrears M/s. Royal S.K.M.
Bhandup
31/07/07
132
22/06/07
In the matter of theft case Shri P. Pushparaj
Bhandup (W),
17/07/07 Download now
13313/07/06 Regarding alleged theft of energy and there upon assessment of energy charges M/s. Indian Swad Restaurant
Thane
10/08/07 Download now
13413/07/06 In the matter of theft case Shri Mahadev Narayan Mahadik
Thane (W)
10/08/07 Download now
13517/07/06 In the matter of refund of charges levied for fresh power supply M/s.Govind Industries,
Taloja,
10/08/07 Download now
13626/07/07 In the matter of bill revision Shri Sanjay R. Shukla
Bhandup
11/10/07 Download now
13701/08/07 In the matter of bill revision Shri Kishor D. Sankhe
Thane.
16/10/07 Download now
13803/08/07 In the matter of bill revision M/s. Shiv Shakti Enterprises
Bhandup
28/09/07 Download now
13910/08/07 In the matter of started getting abnormal bills M/s. Welfare
Co-operative
Housing Society  Ltd.,
Kharghar,
21/09/07 Download now
14010/08/07 In the matter of bill revision Shri Dhairyadhar Janardhan Patil,
Kalwa
05/10/07 Download now
141
13/08/07
Regarding wrong assessment of energy bill to an ayurvedic dispensary Dr. Shridhar Vithal
 Thane
16/10/07 Download now
14229/09/07 In the matter of multiplying factor and consequent bill revision M/s. Stups Consultant Ltd.,
Vashi,
20/10/07 Download now
14301/11/07 In the matter of failed DTC and Compensation towards failure to maintain standard of performance as per MERC Guidelines Dr. Satyanand
Rajaram Khade,
Bhiwandi
25/01/08 Download now
14402/11/07 In the matter of bill revision Shri Asad Ibrahim
Khan,
Bhiwandi
25/01/08 Download now
14502/11/07 In the matter of bill revision Smt. Khalida Asad
Khan,
House No. 1603, Khoni,  Bhiwandi
25/01/08 Download now
14619/11/07 In the matter of bill revision Shri Dilip Verma, Sunil S. Shah & Kantilal S.Shah
Chamunda Textile Mills, Bhiwandi
09/05/08 Download now
14719/11/07 In the matter of giving Additional Power load Shri. Sonumal Sunil Kumar,
Bhiwandi
05/04/08 Download now
14820/11/07 In the matter of wrong collection of S.L.C. M/s. Standard Alkali,
(Chemical Division
of Standard
Industries Ltd.)
Ghansoli,
20/02/08 Download now
14924/12/07 In the matter of exhorbitant energy bill and disconnections without notice Mr. Ramkishor G.
Gupta,
Thane
25/01/08 Download now
15027/12/07 In the matter of reconnection in existing installation Mr. Ramkrishna G.
Patil
Bhandup (E),
25/01/08 Download now
151
29/12/07
In the matter of new connections to residential & commercial complex Varun Developers,
Thane
13/02/08 Download now
15217/01/08 In the matter of theft case M/s. Magtech Mobile Spares Pvt. Ltd.,
Rabale,
15/03/08 Download now
15323/01/08 In the matter of new connections to residential & commercial complex Mr. Mangesh Mohan Acharekar,
Bhandup,
03/03/08 Download now
15421/01/08 In the matter of bill revision Shri Fatte Mohd.
Shaikh,
Bhiwandi
07/05/08 Download now
15501/02/08 In the matter of previous arrears and new connection and bill revision Shri Sadanan R. Shetty
Mulund
01/04/08 Download now
156
11/02/08
In the matter of Billing dispute Shri Rishi Bansal
Mulund
15/06/08 Download now
15711/02/08 In the matter of Excessive Billing Shri Manohar
Jaitapkar
Mulund
15/03/08 Download now
15818/02/08 In the matter of waival of Interest on delayed payment M/s. Maharashtra
Small Scale Ind.
Development Corpn.
Ltd.
Thane
01/04/08 Download now
15915/02/08 In the matter of bill revision and related incidental issues M/s. Rungta Sizing
Works & Processors
Bhiwandi
Case withdraw Download now
16015/02/08 In the matter of bill revision and related incidental issues M/s. Khemisati
Processors
Bhiwandi
Case withdraw Download now
16115/02/08 In the matter of bill revision and related incidential issues M/s Shree
Shivkrupa
Synthtic Pvt. Ltd.
Bhiwandi
Case withdraw Download now
16215/02/08 In the matter of bill revision and related incidential issues M/s. Bhagirathi
Processors
Bhiwandi
Case withdraw Download now
16315/02/08 In the matter of bill revision and related incidential issues M/s. Balaji Polysters
Pvt. Ltd.,
Bhiwandi
Case withdraw Download now
16415/02/08 In the matter of waival of Interest on delayed payment M/s. Raunak Dyeing
Pvt.Ltd.,
Bhiwandi
15/04/08 Download now
16515/02/08 In the matter of bill revision and related incidential issues M/s. Invil Infra-
Structure
Bhiwandi
Case withdraw Download now
16615/02/08 In the matter of earst while arrears Shri Riyaz A.G.
Ansari,
Bhiwandi,
09/05/08 Download now
16726/02/08 In the matter of wrong claim raised Shri Jaganath G.
Yadav,
Mulund
25/04/08 Download now
168
22/02/08
In the matter of incorrect supplementary bill Shri V.P. Kadam,
Mulund
15/04/08 Download now
16907/03/08 In the matter of excessive billing and revision of bills M/s. Khawja Palace Co.
Op. Hsg.
Society, Kausa,
07/05/08 Download now
170 In the matter of bill revision M/s. Pooja Textile,
Bhiwandi,
19/04/08 Download now
171 In the matter of bill revision Shri Vivek R.
Sharma,
Vashi,
09/05/08 Download now
172 In the matter of bill revision Shri Navinchandra
Anandji Thakkar,
Vashi,
25/04/08 Download now
173 In the matter of bill revision Shri Kirit R.
Kapadia,
Bhiwandi,
26/06/08 Download now
174 In the matter of Refund of security deposit Commander
Surinder
Mahandwan
& Dolly Singh
Mahandwad,
Nerul
25/04/08 Download now
175 In the matter of Bill revision Shri Vijay Bahadur
Ray,
Bhiwandi
29/05/08 Download now
176 In the matter of energy bills on the status of faulty meter and average billing M/s. Ashok
Properties,
Bhiwandi
26/06/08 Download now
177 In the matter of bill dispute Shri Shantilal V.
Gada,
Bhandup
25/04/08 Download now
178 In the matter of load enhancement and correct application of power loom tariff M/s.Priya Textiles,
Bhiwandi
02/06/08 Download now
179 In the matter of average billing Shri Shah Modkn. Aminkhan,
Bhiwandi
02/06/08 Download now
180
10/04/08
In the matter of granting compensation claim M/s. R.T. Textile,
Bhiwandi
13/06/08 Download now
181
11/04/08
In the matter of granting compensation for delay in sanctioning of additional load M/s.Pooja Textile,
Bhiwandi
13/06/08 Download now
18223/04/08 In the matter of bill revision Shri Nemchand
Dharmal,
Bhiwandi
13/06/08 Download now
18323/04/08 In the matter of demand for double feeding supply M/s. Maharashtra
Dyeing & Printing
Works
Bhiwandi
25/06/08 Download now
184
06/05/08
In the matter of bill revision Shri Kirit R. Kapadia,
Bhiwandi
26/06/02 Download now
18509/04/08 In the matter of service of utility’s franchisee M/s. Torrent Power Ltd. Maharashtra
Electricity Consumer
Association
Bhiwandi
13/06/08 Download now
18612/05/08 In the matter of reimbursement of installation M/s. Prakash
Developers,
Mulund
08/08/08 Download now
187 In the matter of charging domestic electric connections to housing project under ORC M/s. Haware
Engineers &
Builders Pvt. Ltd.,
Vashi
25/07/08
18823/05/08 In the matter of energy Bills issued for the closed factory (billing dispute and request for disconnection) Shri Joseph
Varghesse
Bhiwandi
11/07/08 Download now
18915/05/08 In the matter of disconnection without notice Shri Vijay Laxman
Patil,
Mulund
25/06/08 Download now
19017/05/08 In the matter of threat of disconnection of power supply by utility Shri Mohanlal B.
Mistry,
Mulund
16/07/08 Download now
19131/05/08 Matter regarding unauthori zed use of electricity case under Section 126 of Indian electricity Act. Smt. Kusum M.
Chheda & Shri
Motilal Devji Chheda,
Bhandup
11/07/08 Download now
192 In the matter of non furnishing of CPL to the consumer Maharashtra
Electricity Consumer Association
Bhiwandi
13/06/08 Download now
19307/06/08 In the matter of new connection Rakesh Kumar H.
Tiwari,
Bhandup
01/07/08 Download now
19410/06/08 In the matter of change in names of 11 consumers residential connections Shri Ajay Bhaskar
Bhonsle,
Thane
08/08/09 Download now
19513/06/08 In the matter of Bill Revision. Smt. Chetna Vijay
Kumar Shah &
Other two
Bhiwandi
05/09/08 Download now
19619/06/08 In the matter of bill dispute Secretary.
Shree Shantiniketan
CHS Ltd.
Kharghar
19/07/08 Download now
19719/06/06 In the matter of change in category of the consumer M/S Sunjana
Developers,
Thane
08/08/08 Download now
19821/06/08 In the matter of billing dispute arising out of theft allegation M/s. Premier
Synthetic
Processors Ltd.,
Pawane
16/07/08 Download now
19908/07/08 Mr. Ramzan Ali S.
Ali Ansari
Bhiwandi
Forwarded to ICGRC
20015/07/08 In the matter of Compensation M/s. Heena Touring
Talkies
Bhiwandi
26/06/08 Download now
20110/07/08 In the matter of tariff rate for continuous process industry and refund and interest thereof M/s. Suchak Kraft
Paper Industries,
Pawane
25/09/08 Download now
20210/07/08 In the matter of Security Deposit. Shri Srinivasan
Gopalan.
Mulund
12/09/08 Download now
20304/08/08 In the matter of change in category of the consumer Mr.Dashrath S.
Kharmale,
Thane
14/08/08 Download now
20404/08/08 In the matter of disconnection of bill revision Shri Rajkumar
Mulchand Sharma
Ghansoli
05/09/08 Download now
20508/08/08 In the matter of wrong recovery under 126 of E.A. 2003 M/s. Saibaba
Construction
Mulund
07/10/08 Download now
206
18/08/08
In the matter of Bill Revision. M/s. M.H.Kakad
Bhiwandi
12/09/08 Download now
207
18/08/08
In the matter of
assessment of Amended Bills
Smt Kanta G.
Kothari
Bhiwandi
21/10/08 Download now
208
26/08/08
In the matter of wrong inspection Report and imposition of penalty Shri, Abbas Ali Jalil
Ahmed Ansari
Bhiwandi
25/09/08 Download now
209
28/08/08
In the matter of Bill Revision. Shri, Mahesh R.
Gupta
Bhiwandi
12/09/08 Download now
210
22/08/08
In the matter of change of purpose i.e. OPL to Power loom tariff Shri Haroon N.
Momine
Bhiwandi
25/09/08 Download now
211
22/08/08
In the matter of Reduction of load Shri Habib
Rehaman
Abdul W. Ansari
Bhiwandi
25/09/08 Download now
212
12/09/08
In the matter of waiver of interest on dues M/s. Annapurna
Restaurant,
Wagle Estate
03/10/08 Download now
213
26/09/08
In the matter of wrong average billing M/s. M.H. Kakad,
Bhiwandi
29/12/08
214
29/09/08
In the matter of illegal and unauthorized act of disconnection of electric meter Shri Ansari Mohd.
Arham Fazlurehman
Bhiwandi
27/10/08 Download now
215
07/10/08
M/s. Momin Nausad
Sarwar Ali
Bhiwandi
Withdraw
216
07/10/08
Smt. Sarwari Sarwar
Ali Momin
Bhiwandi
Withdraw
217
07/10/08
Shri. Aslam Abdul
Waheed Sheikh
Bhiwandi
Withdraw
218
07/10/08
Smt. Sarwari Sarwar
Ali Momin
Bhiwandi
Withdraw
219
07/10/08
In the matter of granting of power loom subsidy for allied Industry and reopening of the latest case decided by the Forum Shri Haroon N.
Momine
Bhiwandi
10/10/08 Download now
220
10/10/08
Shri S. Kumar &
Nation Vise Ltd
Bhiwandi
221
07/10/08
In the matter of new connection and arrears of previous occupier Shri Satnarayanan Vaddepalli,
Rabale
01/12/08 Download now
222
17/10/08
M/s. Kaka Rayons
Bhiwandi
223
21/10/08
In the matter of bill revision Shri Mahesh
Rajaram Gupta
Bhiwandi
01/12/08 Download now
224
10/10/08
In the matter of illegal removal of meter and disconnecting the supply Shri Rajeshkumar
H. Sejpal
Bhiwandi
06/12/08 Download now
225
23/10/08
In the matter of waiver of Bill revision M/s. Paras
Industries,
Thane
01/12/08 Download now
226
28/08/08
In the matter of bill revision. Shri Murli Nair,
Thane
01/12/08 Download now
227
31/10/08
In the matter of disconnection of energy supply Shri Parshuram Choudhary
Bhandup
12/11/08 Download now
228
31/10/08
In the matter of Interim order Shri Haresh Paresh
Bhai Mehta
Bhiwandi
25/11/08 Download now
229
31/10/08
In the matter of Interim order Shri Sajida Mukhtar
Ahmed
Bhiwandi
25/11/08 Download now
230
06/11/08
Shri Chaganlal M.
Hariya
Bhiwandi
231
06/11/08
In the matter of disconnection of energy supply Shri N. Patel,
Belapur
Download now
232
10/11/08
M/s. Dodhia
Synthetics Ltd
Bhiwandi
233
10/11/08
M/s. Dhantex Poly
Cotton Pvt Ltd
Bhiwandi
234
10/11/08
M/s. Shreekar
Polyster Pvt. Ltd
Bhiwandi
235
10/11/08
M/s. Sidhant Dyeing
Pvt.Ltd.
Bhiwandi
236
10/11/08
M/s. Kailash Textiles
Bhiwandi
237
10/11/08
M/s. Shankar Dyeing
Mills Pvt. Ltd
Bhiwandi
238
10/11/08
M/s. Trishul
Processors Pvt. Ltd
Bhiwandi
239
01/11/08
In the matter of wrong recovery of Flying Squad Shri Habibur  F.
Ansari
Bhiwandi
240
01/11/08
In the matter of wrong recovery of Flying Squad Shri Atiqur   F.
Ansari
Bhiwandi
241
11/11/08
Shri Qureshi Rais
Ahmed Nadir
Hussain
Bhiwandi
242
15/11/08
In the matter of extra
Recovery charged
Shri Ravji B.
Ghadigaonkoar,
Mulund
12/12/08 Download now
243
21/11/08
Mrs. Ansari
Hadisunisa Abdul
Hafiz
Bhiwandi
244
21/11/08
Shri Ansari Anis
Ahmed Muneef
Ahmad
Bhiwandi
245
06/12/08
M/s. Shreekar Poly-
Sters Pvt. Ltd.,
Bhiwandi
246
02/12/08
M/s. Sidhant Dyeing
Pvt.Ltd
Bhiwandi
247
08/12/08
Mrs. Kshama
Haresh
Mehata
Bhiwandi

Urja
Empowering the Consumer